
23
Fasten 1x6 T&G Boards to Rafters at each end
using two (2) 2” Nails per end.
Align the 1x6 T&G Board to the Band Board and
Fasten in the center using one (1) 2” Nail.
Install all remaining 1x6 T&G Boards at each
section, as shown in previous steps.
Locate the second longest 1x6 T&G Board and
place the tongue into the groove and fasten at each
end using two (2) 2’’ Nails per end.
Work your way towards the peak of the roof, as
shown in previous steps.
Locate the Roof Fascia Board.
Fasten each board along both
ends using two (2) 2” Nails
Roof Fascia Board
Roof Assembly