11
Fasten Center Floor Boards to Joist using twelve
(12) 2
1/2” Screws. (One (1) Screw at each
pre-drilled hole.)
Using a
3/16” Drill Bit, drill through the Floor
Boards into the 2x4 Diagonal joist and fasten using
2
1/2” Screws. (One (1) Screw at each pre-drilled
hole.)
Floor Assembly
Locate the Cedar Floor Trim.
Place the Cedar Floor Trim Underneath the
Floor Boards and flush with the corner of the 2x4
Band Board.
Band Board
Cedar Floor Trim
Fasten the Cedar Floor Trim to the 2x4 Band Board
using three (3) 1
5/8” Screws through pre-drilled
holes.
Align adjacent Cedar Floor Trim and fasten, as
shown previous steps.