Place the Small Tar Paper piece on the top side. 

Overlap the Small piece over the Large piece by 

2”. Fasten using a Hammer Tacker.

Install the Tar Paper on each Roof Section, as 

shown in previous steps.

Fasten Tar Paper to T & G using a Hammer Tacker.

Locate the Ridge Tar Paper.

Center the Ridge Tar Paper and fasten 

approximately every 6” using a Hammer Tacker.

Install remaining Ridge Tar Paper, as shown in 

previous steps.

Overlap

Ridge Tar Paper

Tar Paper

Содержание Octagon Cedar Gazebo

Страница 1: ...Assembly Manual Octagon Cedar Gazebo...

Страница 2: ...roduct that consists of heavy bulky pieces With your purchase you assume full responsibility to have the necessary manpower and or equipment available to unload the items You also agree that any damag...

Страница 3: ...S S Screws 8 Hurricane Plates Concrete drill bit 120 2 1 2 Screws 45 1 1 4 Screws 206 3 Screws 520 2 Nails 8 3 8 x5 Roof Bolts 16 Washers Acorn Nuts 100 10 D Nails Railing Spacer Block Sand Paper 18 4...

Страница 4: ...Connection Plate 8 of each size Floor Boards 1 of each size Center Floor Boards 16 Outside ply 8 Inside Ply Posts Boards 8 Brace Section 7 Hand Rails 63 1x3 Spindles 7 2x3 Bottom Rail 8 Double 2x4 Raf...

Страница 5: ...ce the Band Boards around the perimeter of the 2x4 Joists Floor Assembly Set your Gazebo Package as close to the building site as possible Remove protective shrink wrap Do not unwrap un til you are re...

Страница 6: ...he center as shown Align the short point of the 2x4 Band Board with the long point of the Joist and fasten Band Board to Joist using two 2 3 Brown Screws through pre drilled holes Push each Joist agai...

Страница 7: ...d holes in the 2x4 Band Board and fasten using two 2 3 Screws through pre drilled holes Place remaining Diagonal Floor Joists in Place as shown Fasten the 45 angled end to the Double 2x4 Joist using t...

Страница 8: ...o create equal distance on both ends Fasten Floor Board to Joist using two 2 2 1 2 Screws through pre drilled holes Place each of the Longest Floor Boards around the outside perimeter of the floor Ali...

Страница 9: ...le through Floor Boards above each 2x4 Diagonal Floor Joist and one 1 hole in the center into Band Board Then fasten using 2 1 2 Screws one 1 at each pre drilled locations Lay out the Second Floor Boa...

Страница 10: ...Floor Boards as shown in previous steps Fasten the Second Floor Boards as shown in previous steps Locate the Center Floor Boards Floor Assembly Place Center Floor Boards as shown Space the Center Flo...

Страница 11: ...sing 2 1 2 Screws One 1 Screw at each pre drilled hole Floor Assembly Locate the Cedar Floor Trim Place the Cedar Floor Trim Underneath the Floor Boards and flush with the corner of the 2x4 Band Board...

Страница 12: ...as shown Locate the Cedar Hand Rail and place on a clean flat surface Locate the 1x3 Spindles Place the 1x3 Spindles into the Pockets of the Cedar Hand Rail Install remaining Cedar Floor Trim as show...

Страница 13: ...led Bottom Rail Sections off to the side Locate the Outside Post Plies and place on a clean level surface Ensure the long Point is facing up Long Point Place the second Outside Post Ply approximately...

Страница 14: ...ond Outside Post Ply Brace Section installed Place a Bottom Rail Section between the Outside Post Plies on top of the Spacer Block as shown Place the Brace Section in the notch in the Outside Post Ply...

Страница 15: ...re drilled holes as shown Fasten using two 2 3 Screws through pre drilled holes Fasten the opposite end of the Bottom Rail Section to the second outside Post Ply as shown in previous steps Railing and...

Страница 16: ...ction Locate the Inside Post Ply Align the angle cut of the Inside Post Ply with the Outside Post Ply Fasten using 2 1 2 Screws through pre drilled holes Post and Rail Assembly Fasten with 2 1 2 Screw...

Страница 17: ...pening at the top of the doorway Install all remaining Post Rail Sections as shown in previous steps Keeping the door measurement in place Space each post an equal distance from the edge of the floor...

Страница 18: ...the Deck Boards through the holes in the L Bracket If You did not purchase a floor with your gazebo follow the next 2 steps to fasten the post If Attaching to concrete use 1 3 4 Concrete Screws If at...

Страница 19: ...the Double 2x4 Rafter Place the Double 2x4 Rafter into the slot at the top of the Post and align the hole in the Rafter with the holes in the Post Roof Assembly Only hand tighten for now Prepare Roof...

Страница 20: ...after as shown in previous steps Install the Rafter directly opposite of the previously installed Rafter as shown in previous steps Locate the Compression Ring Lift Compression Ring into place Roof As...

Страница 21: ...t on the other side Push up on the Double 2x4 Rafters in the center until the Roof Band Board is center of the Rafter Locate the Roof Band Board Place edge of Roof Band Board in center of the Double R...

Страница 22: ...h two 2 3 Screws Roof Assembly Align Here Fasten Here Install all remaining Roof Band Boards as shown in previous steps Tighten Roof Bolts at all Post locations using a 5 8 socket and wrench Locate th...

Страница 23: ...aining 1x6 T G Boards at each section as shown in previous steps Locate the second longest 1x6 T G Board and place the tongue into the groove and fasten at each end using two 2 2 Nails per end Work yo...

Страница 24: ...p of the 1x6 T G Boards and flush with the Roof Band Board at each end Roof Assembly Three 3 Screw locations Align adjacent Fascia Board and attach to Roof Band Board using previous steps Align Here L...

Страница 25: ...on the one end of the Post Trim Place against the outside of the Post Install one Hurricane Plate at each Roof Splice as shown in previous steps Place the Hurricane Plate on top of the 1x6 T G Boards...

Страница 26: ...on the Post work your way down and fasten with five 5 1 5 8 Screws one 1 Screw through each pre drilled hole Center on the inside of the Post and fasten with 1 5 8 Screws through pre drilled holes In...

Страница 27: ...cker Install the Tar Paper on each Roof Section as shown in previous steps Fasten Tar Paper to T G using a Hammer Tacker Locate the Ridge Tar Paper Center the Ridge Tar Paper and fasten approximately...

Страница 28: ...28 Tar Paper installed Ready for Shingles Your Gazebo is now ready for shingles and good times...

Страница 29: ...Congratulations Enjoy your new Gazebo YardCraft com Info YardCraft com 191 Jalyn Drive New Holland PA 17557 1 844 442 1615...

Отзывы: