
Operating
Manual
YZ-X9
2
Contents
Notes
························································································
3
Notes
························································································
4
Machine operation instructions
·················································
5
Receiving machine
·····································································
6
Remove the machine packing
·······················································
6
Install the battery
··································································
6
Machine cleaning mode
······························································
7
Brush and clean mat information
···············································
7
Machine Installation
································································
7
Install the water suction stripping assembly
···························
7
Install brush / cleaning pad
····················································
7
Machine Operation
·····································································
8
Pre before operation
································································
8
Operating the machine
·······························································
8
During the machine operation, the
············································
8
Battery power meter
··································································
9
Water tank drainage
··································································
9
Sewage discharge tank
·······························································
9
Echarge the clear water tank
····················································
9
Battery charging
······································································ 10
Machine maintenance
··································································
10
Daily maintenance
····································································
10
Monthly maintenance
··································································
11
Maintenance maintenance
····························································
12
Handling machine
·······································································
13
Storage machine
········································································
13
Machine parameters
···································································
14