5. Initial Installation & Operation
General
The filter assembly is protectively packed with all parts assembled.
Installation
1.
Take the filter assembly out of the wood platform.
2.
Install the filter assembly to the inlet line and outlet line.
3.
Connect a drainpipe to the hydraulic flushing valve outlet opening (at
least 63 mm or 2” diameter and no longer then 5m). Confirm that water
runs freely out of the drainpipe.
4.
Position the control panel in such a way as to be protected against
humidity and solar radiation.
5.
Connect the control panel to the power source.
6.
Check that all connections are properly secured.
7.
Check that all bolts and nuts on filter periphery are properly tightened
and secured.
8
Figure 2: Initial Filter Installation
AF9800
Содержание AF-9800 Series
Страница 16: ...16 Figure 9 Fine Screen Assembly Removal Installation AF9800 ...
Страница 18: ...18 Figure 10 Dirt Collector Removal Installation AF9800 ...
Страница 20: ...20 Figure 10 Periodical Checks AF9800 ...
Страница 21: ...21 7 IPB AF9800 ...