- 7 -
2. PRE-OPERATION PROCEDURES
Installation Precautions
6. Place in a dry location.
CAUTION!
7. Connect to a properly rated power supply.
Connect power cable to a suitable facility outlet or terminal, according to the following
electrical requirements.
Power requirements:
CF301: 115V AC, 50/60Hz, 5.6A
NOTE)
Check the line voltage on outlet or terminal to be used and properly evaluate whether to utilize
a line being shared by other equipment. If the unit is not activated by turning on the main
power switch (ELB), take an appropriate course of action, such as connecting the unit to a
dedicated power source.
If multiple power cables are connected to a single outlet, input voltage to unit may drop,
causing degraded cooling and temperature control performance.
8. Install in a safe, well-ventilated area.
In the event of an earthquake or other unforeseen incident, equipment may unexpectedly shift
or fall, causing injury. Taking preventative steps to install unit in a safe location, away from
room access doors and out of harm
’s way is strongly recommended.
Install unit so that side panel heat vents (see
“Main Unit Overview” on P.12 for location) are
unobstructed and allowed to sufficiently diffuse heat. Failure to do so may result in excessive
temperatures inside the unit control panel, causing possible degraded CPU board
performance, malfunction or fire. See installation specifications on P.5 above.
Place unit where it will be free from liquid spray
and other moisture. Failure to do so may result
in control mechanisms becoming wet, causing
malfunction, electrical shock and/or fire.