–24–
CABLE ROUTING
SPEC
J Route the sidestand switch lead and oil level switch
lead to the inside of the drive sprocket cover.
K Do not crush the water pump breather hose and
plastic clip.
L Pass the fuel tank breather hose and the air filter
drain hose through the steel clamps and then after
routing the hoses to the exterior of the under cowl-
ing, align the leading ends of the hoses.
M Route the engine oil level switch lead and side-
stand switch lead inside the coolant hose.
C To the connector cover.
D Route the seat lock cable over the wire harness.
E Fasten the wire harness with a plastic clamp.
F Make sure the rear flasher light lead coupler and
tail light lead coupler in the rubber cover.
G Route the rear turn signal lead through the hole in the
upper rear fender.
H 50 mm
I Fasten the sidestand switch lead, engine oil level
switch lead, and water pump breather hose with a
plastic clip.
Содержание YZF-R1 2000
Страница 1: ......
Страница 2: ......
Страница 23: ... 15 1 Exhaust camshaft 2 Intake camshaft 3 Oil filter OIL FLOW DIAGRAMS SPEC ...
Страница 24: ... 16 1 Cylinder head 2 Crankshaft OIL FLOW DIAGRAMS SPEC ...
Страница 26: ... 18 1 Thermostat housing 2 Water pump 3 Radiator 4 Radiator fan COOLANT FLOW DIAGRAMS SPEC ...
Страница 27: ... 19 1 Radiator 2 Thermo unit COOLANT FLOW DIAGRAMS SPEC ...
Страница 76: ......