2-14
CABLE ROUTING DIAGRAM
SPEC
1
Ground lead
2
Ignition coil lead
3
Clamp
4
Wireharness
5
CDI magneto lead
6
YPVS breather hose
7
Radiator breather hose
8
Cable guide
9
“ENGINE STOP” button lead
0
Brake hose
A
Pass the “ENGINE STOP” but-
ton lead on the inside of the
ignition coil lead and ground
lead.
B
Clamp the “ENGINE STOP” but-
ton lead, ground lead, ignition
coil lead, wireharness and CDI
magneto lead with the clamp
ends downward.
In so doing, clamp the “ENGINE
STOP” button lead at its coupler
and do not allow the CDI mag-
neto lead to slacken.
C
Pass the radiator breather hose
outside the engine bracket and
inside the down-tube.Pass the
radiator breather hose inside
the CDI magneto lead.
D
Clamp the CDI magneto lead,
radiator breather hose and
YPVS breather hose. In so
doing, clamp the CDI magneto
lead at the rear of the down-
tube with the clamp ends out-
ward.
E
Clamp the radiator breather
hose and CDI magneto lead at
the rear of the down-tube with
the clamp ends outward.
F
Pass the radiator breather hose
and CDI magneto lead in front
of the radiator hose.
G
Pass the radiator breather hose
between the frame and radiator.
H
Align the top of the brake hose
neck with the brake hose holder
bottom.
I
Pass the brake hose in front of
the axle boss,then fit it into the
hose groove so that the brake
hose does not contact the nut
(wheel axle).
J
Fit the brake hose into the guide
on the protector.
5UP-9-30-2 5/24/02 5:18 PM Page 52
Содержание YZ250R
Страница 1: ......
Страница 53: ...3 3 INSP ADJ MEMO ...
Страница 268: ...TUN MEMO ...
Страница 269: ......