2-15
CABLE ROUTING DIAGRAM
SPEC
1
Clutch cable
2
Cable guide
3
Ground lead
4
Clamp
5
Wireharness
6
High tension cord
7
Ignition coil
8
Radiator breather hose
9
“ENGINE STOP” button lead
0
Throttle cable
q
Engine bracket
A
Pass the clutch cable into the
cable guide.
B
Clamp the clutch cable, high
tension cord and wireharness at
the protector of the high tension
cord so that the clamp passes
with its ends downward, as
shown.
C
Position the CDI magneto lead
coupler between the radiators.
D
Clamp the wireharness to the
right engine bracket.
E
Clamp the high tension cord,
throttle cable and wireharness
with the clamp ends downward,
so that the high tension cord
does not contact the engine
bracket installation nuts.
F
Fasten the ground lead together
with the front installation portion
of the ingnition coil.
G
Pass the radiator breather hose
at the rear of the radiator hose
and in front of the ignition coil
bracket.
H
Position the throttle cable,
“ENGINE STOP” button lead
and clutch cable as shown.
5UP-9-30-2 5/24/02 5:18 PM Page 54
Содержание YZ250R
Страница 1: ......
Страница 53: ...3 3 INSP ADJ MEMO ...
Страница 268: ...TUN MEMO ...
Страница 269: ......