2-18
CABLE ROUTING DIAGRAM
1.
Clamp
2.
Wire harness
3.
High tension cord
4.
CDI unit band
5.
CDI unit
6.
CDI unit lead
7.
Connector cover
8.
Radiator hose
9.
Radiator breather hose
10. CDI unit stay
A.
Clamp the wire harness protect-
ing tube to the right engine
bracket.
B.
Pass the high tension cord to the
right of the radiator hose so that
the high tension cord does not
contact the radiator hose.
C.
Pass the CDI unit lead between
the frame and the radiator (right)
and then above the radiator fit-
ting boss.
D.
Bring the connector cover into
contact with the coupler.
E.
Pass the radiator breather hose
behind the radiator hose.
F.
Insert the CDI unit band until it
stops at the CDI unit stay.
Содержание yz250 2015
Страница 4: ......
Страница 12: ...1 2 LOCATION OF IMPORTANT LABELS EUROPE ...
Страница 13: ...1 3 LOCATION OF IMPORTANT LABELS AUS NZ ZA ...
Страница 62: ...3 18 CHASSIS ...
Страница 153: ...5 40 REAR SHOCK ABSORBER 7 Tighten Bolt air filter joint 1 ...
Страница 174: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER ...