5-24
HANDLEBAR
HANDLEBAR
REMOVING THE HANDLEBAR
Order
Part name
Q'ty
Remarks
Number plate
Remove the band only.
1
Clutch cable
1
Disconnect at the lever side.
2
Clutch lever holder
1
3
Engine stop switch
1
4
Brake master cylinder
1
Refer to removal section.
5
Throttle cable cap
1
Turn over the cap cover.
6
Throttle cable
1
Disconnect at the throttle side.
7
Throttle
1
Loosen the bolts.
8
Cap cover
1
9
Collar
1
10
Left grip
1
Refer to removal section.
11
Handlebar upper holder
2
12
Handlebar
1
13
Handlebar lower holder
2
0.5 Nm (0.05 m kg, 0.36 ft lb)
0.5 Nm (0.05 m kg, 0.36 ft lb)
9 Nm (0.9 m kg, 6.5 ft lb)
28 Nm (2.8 m kg, 20 ft lb)
4 Nm (0.4 m kg, 2.9 ft lb)
4 Nm (0.4 m kg, 2.9 ft lb)
40 Nm (4.0 m kg, 29 ft lb)
5 Nm (0.5 m kg, 3.6 ft lb)
Содержание yz250 2015
Страница 4: ......
Страница 12: ...1 2 LOCATION OF IMPORTANT LABELS EUROPE ...
Страница 13: ...1 3 LOCATION OF IMPORTANT LABELS AUS NZ ZA ...
Страница 62: ...3 18 CHASSIS ...
Страница 153: ...5 40 REAR SHOCK ABSORBER 7 Tighten Bolt air filter joint 1 ...
Страница 174: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER ...