2-17
CABLE ROUTING DIAGRAM
G.
Clamp the radiator breather
hose, CDI magneto lead and
neutral switch lead to the frame.
H.
Pass the CDI magneto lead, ra-
diator breather hose and neutral
switch lead in front of the radia-
tor hose. Then pass the radiator
breather hose inside the CDI
magneto lead and neutral switch
lead.
I.
Pass the radiator breather hose
and ignition coil lead between
the frame and the radiator (left).
J.
Locate the clamp ends in the ar-
rowed range.
K.
Bring the connector cover into
contact with the coupler.
Содержание yz250 2015
Страница 4: ......
Страница 12: ...1 2 LOCATION OF IMPORTANT LABELS EUROPE ...
Страница 13: ...1 3 LOCATION OF IMPORTANT LABELS AUS NZ ZA ...
Страница 62: ...3 18 CHASSIS ...
Страница 153: ...5 40 REAR SHOCK ABSORBER 7 Tighten Bolt air filter joint 1 ...
Страница 174: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER ...