43
ENGINE REMOVAL
ENG
Order
Job name / Part name
Q’ty
Remarks
1
2
3
4
5
6
7
8
9
Hoses, air filter case, engine mounting
bolt and engine removal
Crankcase breather hose
Inlet hose (water pump)
Outlet hose (cylinder head)
Air filter case assembly
Bolt
Self locknut / Plane washer
Bolt
Bolt/ Plane washer / Rod assembly
Engine
1
1
1
1
2
1 / 1
1
1/2/1
1
Remove the parts in order.
(Rear shock absorber – lower)
Reverse the removal procedure for
installation.
Refer to “ENGINE REMOUNTING”
section.
32 Nm (3.2 m
kg)
64 Nm (6.4 m
kg)
20 Nm ( 2.0 m
kg)
HOSES, AIR FILTER CASE, ENGINE MOUNTING BOLT AND ENGINE
Содержание YP250 5GM2-AE1 2000
Страница 1: ......
Страница 2: ......
Страница 10: ......
Страница 73: ...63 FRONT WHEEL CHAS 5 Install Speed sensor lead 1 ...
Страница 77: ...67 CIRCUIT DIAGRAM ELEC CIRCUIT DIAGRAM ...
Страница 104: ......