20
1
Box light
2
Rectifire / regulator
3
Air induction system air filter
4
Wireharness
5
Battery negative lead
6
Battery positive lead
7
Seat lock cable assembly
8
Battery
9
Rodiator reservoir tank
10
Ignition coil
11
Air induction system
12
Engine ground
13
Engine bracket
14
Rear brake hose
15
A. C. magneto lead
16
Starter motor lead
A Fasten the wireharness to the
frame with a plastic locking tie.
B Route the brake hose assembly
through the clamp of engine
bracket.
C Fix the seat lock to the box.
D Fasten the wireharness to the
frame with a plastic locking tie.
E Clamp the rear brake hose.
F Clamp the wireharness to the
frame with a plastic locking tie.
G Fasten the seat lock cable and
wireharness with a band and
band of the end on inside of the
frame.
CABLE ROUTING
SPEC
Содержание YP250 5GM2-AE1 2000
Страница 1: ......
Страница 2: ......
Страница 10: ......
Страница 73: ...63 FRONT WHEEL CHAS 5 Install Speed sensor lead 1 ...
Страница 77: ...67 CIRCUIT DIAGRAM ELEC CIRCUIT DIAGRAM ...
Страница 104: ......