7 - 42
–
+
ELEC
SIGNALING SYSTEM
YES
NO
YES
NO
3.Turn signal switch
• Check the turn signal switch for continu-
ity.
Refer to “CHECKING THE SWITCHES”.
• Is the turn signal switch OK?
Replace the left han-
dlebar switch.
4.Voltage
• Connect the pocket tester (DC 20 V) to
the turn signal relay coupler as shown.
Tester positive probe
→
brown
1
Tester negative probe
→
ground
• Set the main switch to “ON”.
• Measure the voltage (12 V) of brown
1
at the turn signal relay coupler.
• Is the voltage within specification?
The wiring circuit
from the main
switch to the turn
signal relay coupler
is faulty and must
be repaired.
5.Voltage
• Connect the pocket tester (DC 20 V) to
the turn signal relay coupler as shown.
Tester positive probe
→
brown/white
1
Tester negative probe
→
ground
YES
NO
• Set the main switch to “ON”.
• Set the turn signal switch to “
” or “
”.
• Measure the voltage (12 V) of brown/
white at the turn signal relay coupler.
• Is the voltage within specification?
The turn signal
relay is faulty and
must be replaced.
6.Voltage
• Connect the pocket tester (DC 20 V) to
the turn signal light connectors (wire
harness side) or the meter assembly
coupler as shown.
Å
Turn signal light
ı
Turn signal indicator light
Left turn signal light
Tester positive probe
→
chocolate
1
Tester negative probe
→
ground
Right turn signal light
Tester positive probe
→
dark green
2
Tester negative probe
→
ground
Å
7
Содержание XV16AL
Страница 1: ...SERVICEMANUAL LIT 11616 12 56 4WM 28197 E0 XV16AL XV16ALC XV16ATL XV16ATLC ...
Страница 43: ...SPEC 2 25 ENGINE OIL LUBRICATION CHART ENGINE OIL LUBRICATION CHART 2 ...
Страница 45: ...2 27 SPEC 1 Valve lifter 2 Push rod 3 Rocker arm shaft 4 Crankshaft ENGINE OIL FLOW DIAGRAMS 2 ...
Страница 46: ...2 28 SPEC 1 Engine oil pump 2 Oil strainer 3 Engine oil drain bolt engine ENGINE OIL FLOW DIAGRAMS 2 ...
Страница 49: ...SPEC 2 31 1 Transfer gear oil pump 2 Middle driven shaft TRANSFER GEAR OIL FLOW DIAGRAMS 2 ...
Страница 111: ...3 54 CHK ADJ CHECKING AND CHARGING THE BATTERY Charging method using a variable voltage charger 3 ...
Страница 112: ...3 55 CHK ADJ CHECKING AND CHARGING THE BATTERY Charging method using a constant voltage charger 3 ...
Страница 216: ...ENG CONTENTS ENGINE ENGINE 5 1 INSTALLING THE ENGINE 5 8 5 ...
Страница 348: ...CARB CHECKING THE AIR INDUCTION SYSTEM 6 26 INSTALLING THE AIR INDUCTION SYSTEM 6 26 6 ...
Страница 377: ...6 29 CARB AIR INDUCTION SYSTEM 13 Install fuel tank Refer to FUEL TANK in chapter 3 6 ...
Страница 415: ...7 37 ELEC SIGNALING SYSTEM EB806000 SIGNALING SYSTEM CIRCUIT DIAGRAM 7 ...
Страница 448: ...PRINTED IN U S A YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...