5 - 116
ENG
CRANKSHAFT AND CONNECTING RODS
3. Measure:
• crankshaft pin-to-big end bearing clear-
ance
Out of specification
→
Replace the big
end bearings.
▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼
The following procedure applies to all of
the connecting rods.
ACHTUNG:
CAUTION:
Do not interchange the big end bearings
and connecting rods. To obtain the correct
crankshaft pin-to-big end bearing clearance
and prevent engine damage, the big end
bearings must be installed in their original
positions.
a. Clean the big end bearings, crankshaft
pins, and the inside of the connecting
rod halves.
b. Install the big end upper bearing into the
connecting rod and the big end lower
bearing into the connecting rod cap.
NOTE:
Align the projections
a
on the big end
bearings with the notches
b
in the connect-
ing rod and connecting rod cap.
c. Put a piece of Plastigauge
1
on the
crankshaft pin.
d. Assemble the connecting rod halves.
NOTE:
• Do not move the connecting rod or crank-
shaft until the clearance measurement
has been completed.
• Lubricate the bolt threads and seats with
molybdenum disulfide grease.
• Make sure the projection
c
on the con-
necting rod faces towards the left side of
the crankshaft.
• Make sure the characters
d
on both the
connecting rod and connecting rod cap
are aligned.
Crankshaft pin-to-big end bearing
clearance
0.037 ~ 0.074 mm
(0.0015 ~ 0.0029 in)
<Limit>: 0.09 mm (0.0035 in)
5
Содержание XV16AL
Страница 1: ...SERVICEMANUAL LIT 11616 12 56 4WM 28197 E0 XV16AL XV16ALC XV16ATL XV16ATLC ...
Страница 43: ...SPEC 2 25 ENGINE OIL LUBRICATION CHART ENGINE OIL LUBRICATION CHART 2 ...
Страница 45: ...2 27 SPEC 1 Valve lifter 2 Push rod 3 Rocker arm shaft 4 Crankshaft ENGINE OIL FLOW DIAGRAMS 2 ...
Страница 46: ...2 28 SPEC 1 Engine oil pump 2 Oil strainer 3 Engine oil drain bolt engine ENGINE OIL FLOW DIAGRAMS 2 ...
Страница 49: ...SPEC 2 31 1 Transfer gear oil pump 2 Middle driven shaft TRANSFER GEAR OIL FLOW DIAGRAMS 2 ...
Страница 111: ...3 54 CHK ADJ CHECKING AND CHARGING THE BATTERY Charging method using a variable voltage charger 3 ...
Страница 112: ...3 55 CHK ADJ CHECKING AND CHARGING THE BATTERY Charging method using a constant voltage charger 3 ...
Страница 216: ...ENG CONTENTS ENGINE ENGINE 5 1 INSTALLING THE ENGINE 5 8 5 ...
Страница 348: ...CARB CHECKING THE AIR INDUCTION SYSTEM 6 26 INSTALLING THE AIR INDUCTION SYSTEM 6 26 6 ...
Страница 377: ...6 29 CARB AIR INDUCTION SYSTEM 13 Install fuel tank Refer to FUEL TANK in chapter 3 6 ...
Страница 415: ...7 37 ELEC SIGNALING SYSTEM EB806000 SIGNALING SYSTEM CIRCUIT DIAGRAM 7 ...
Страница 448: ...PRINTED IN U S A YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...