4-10
1
2
3
4
5
6
7
8
9
A
Choke cable and throttle cable
installation
1.
Install the choke cable
1
and throttle
cable
2
, and then tighten the nuts to the
specified torque.
2.
Adjust the throttle lever free play. See
“Steering system” (3-2).
Carburetor assy. check
1.
Adjust the trolling speed. See “Power
unit” (3-4).
Choke cable and throttle cable guide
installation position
a
:
14.0
±
1.0 mm (0.55
±
0.04 in)
Choke cable nut
b
:
8 N·m (0.8 kgf·m, 5.9 ft·lb)
Throttle cable nut
c
:
8 N·m (0.8 kgf·m, 5.9 ft·lb)
1
b
c
2
a
Содержание WaveRunner VX 700
Страница 1: ...SERVICE MANUAL WaveRunner F2V 28197 ZN 11 VX 700 VX 700 F2V ...
Страница 4: ......
Страница 16: ...1 11 GEN INFO General information MEMO ...
Страница 36: ...2 19 SPEC Specification MEMO ...
Страница 104: ...5 35 POWR Power unit MEMO ...
Страница 141: ...1 2 3 4 5 6 7 8 9 A Deck and hull 8 25 Rear section 8 27 Drain plug check 8 29 Spout installation 8 29 ...
Страница 177: ...1 2 3 4 5 6 7 8 9 A Appendix Wiring diagram A 1 ...
Страница 179: ......
Страница 180: ...YAMAHA MOTOR CO LTD Sep 2010 1 CR E ...