8-22
1
2
3
4
5
6
7
8
9
A
TIP:
Align the projection
a
with the slit
b
.
Ventilation hose installation
1.
Install the grommets
1
.
TIP:
Make sure that the grommet
1
is properly
seated in the hole in the inner hull
2
.
2.
Install the ventilation hoses
3
.
TIP:
• Make sure to route the ventilation hose
(PORT) in front of the ventilation hose
(STBD).
• Make sure that the end of the ventilation
hose
3
is the specified distance
a
from
the groove around the outside of the grom-
met
1
.
Cooling water pilot outlet nut
3
:
4 N·m (0.4 kgf·m, 3.0 ft·lb)
3
1
2
b
a
1
1
2
2
Installation distance
a
:
30–40 mm (1.18–1.57 in)
3
2
2
a
1
3
Содержание WaveRunner VX 700
Страница 1: ...SERVICE MANUAL WaveRunner F2V 28197 ZN 11 VX 700 VX 700 F2V ...
Страница 4: ......
Страница 16: ...1 11 GEN INFO General information MEMO ...
Страница 36: ...2 19 SPEC Specification MEMO ...
Страница 104: ...5 35 POWR Power unit MEMO ...
Страница 141: ...1 2 3 4 5 6 7 8 9 A Deck and hull 8 25 Rear section 8 27 Drain plug check 8 29 Spout installation 8 29 ...
Страница 177: ...1 2 3 4 5 6 7 8 9 A Appendix Wiring diagram A 1 ...
Страница 179: ......
Страница 180: ...YAMAHA MOTOR CO LTD Sep 2010 1 CR E ...