3-5
E
2)
Next 50 minutes:
Do not exceed half throttle (approxi-
mately 3,000 r/min). Vary engine
speed occasionally. If you have an
easy-planing boat, accelerate at full
throttle onto plane, then immediately
reduce the throttle to 3,000 r/min or
less.
3)
Second hour:
Accelerate at full throttle onto plane,
then reduce engine speed to three-
quarter throttle (approximately 4,000
r/min). Vary engine speed occasional-
ly. Run at full throttle for one minute,
then allow about 10 minutes of opera-
tion at three-quarter throttle or less to
let the engine cool.
4)
Third through tenth hours:
Avoid operating at full throttle for
more than 5 minutes at a time. Let the
engine cool between full-throttle runs.
Vary engine speed occasionally.
5)
After the first 10 hours:
Operate the engine normally.
EMU00204
PRE-OPERATION CHECKS
w
If any item in the pre-operation check is
not working properly, have it inspected
and repaired before operating the out-
board motor. Otherwise, an accident
could occur.
c
C
Do not start the engine out of water.
Overheating and serious engine damage
can occur.
68J-9-15-3 1/30/03 15:08 Page 6
Содержание VZ150C
Страница 1: ...VZ150C VZ175C VZ200C OWNER S MANUAL U S A Edition LIT 18626 05 40 ...
Страница 38: ...E MEMO ...
Страница 62: ...E MEMO ...
Страница 92: ...E MEMO ...
Страница 104: ...E MEMO ...
Страница 105: ...EMU00450 Chapter 6 INDEX INDEX 6 1 1 2 3 4 5 6 E ...
Страница 114: ...Printed in Japan March 2003 0 5 1 68J 28199 15 Z150QETO Z175HETO Z200PETO E Printed on recycled paper ...
Страница 116: ...PLACE POSTAGE HERE ATTN WARRANTY DEPARTMENT Warranty card 2 27 02 11 47 AM Page 2 ...