8. Install:
• Induction cap
1
(right cylinder only)
• Starter plunger
2
To carburetor
3
.
NOTE:
Install the stater plunger (right cylinder) after
passing it through the hole
a
of the induction
cap. Refer to “CABLE ROUTING DIAGRAM”
section in the CHAPTER 2.
CARBURETOR AND REED VALVE
4-15
4. Install:
• Needle valve
1
• Float
2
• Float pin
3
• Screw (float pin)
4
NOTE:
• After installing the needle valve to the float,
install them to the carburetor.
• Check the float for smooth movement.
5. Install:
• Power jet
1
To float chamber
2
.
CC
CAUTION:
Do not tighten the power jet too hard, or
you may not remove it when checking and
replacing it.
6. Install:
• Float chamber
1
• Screw (float chamber)
2
CC
CAUTION:
Do not confuse the left and right float
chambers in installation because they are
different from each other. The overflow hole
a
is in the bottom of the float chamber for
the left cylinder and for the right one in the
side.
7. Install:
• Air vent hose
1
• Joint
2
ENG
Содержание TZ250N1/(N)
Страница 1: ...OWNER S SERVICE MANUAL TZ250N1 N LIT 11626 14 44 5KE 28199 11 ...
Страница 11: ...MEMO ...
Страница 15: ...CHAPTER 7 TUNING ENGINE 7 1 CHASSIS 7 14 ...