–104–
6
Order
Job name / Part name
Q’ty
Remarks
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Heat exchanger removal
Coolant
Coolant filler cap
Coolant reservoir tank
Thermostat housing
Coolant hose 1
Coolant hose 2
Joint pipe
Coolant hose 3
Coolant hose 4
Heat exchanger (right)
Coolant hose 5
Coolant hose 6
Heat exchanger (left)
Joint pipe
Coolant hose 7
Coolant hose 8
Heat exchanger (front)
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Remove the parts in the order listed below.
Drain. Refer to “COOLING SYSTEM” in
CHAPTER 2.
For installation, reverse the removal
procedure.
HEAT EXCHANGER
COOL
COOLING SYSTEM
HEAT EXCHANGER
Содержание SXV70ERG
Страница 1: ...SUPPLEMENTARY SERVICE MANUAL ...
Страница 151: ... 145 CABLE ROUTING SPEC ...
Страница 153: ... 147 CABLE ROUTING SPEC ...
Страница 155: ... 149 CABLE ROUTING SPEC ...
Страница 157: ... 151 CABLE ROUTING SPEC ...
Страница 159: ... 153 CABLE ROUTING SPEC ...
Страница 161: ... 155 CABLE ROUTING SPEC ...
Страница 163: ... 157 CABLE ROUTING SPEC ...
Страница 165: ... 159 CABLE ROUTING SPEC ...
Страница 167: ... 161 CABLE ROUTING SPEC ...
Страница 169: ... 163 CABLE ROUTING SPEC ...
Страница 173: ... ੑ 01 06 0 8E ITP PRINTED ON RECYCLED PAPER ...