4-18
SPEC
WIRE ROUTING DIAGRAM
1
Clamp
2
Carburetor
3
Charging coil lead
4
Charging coil
A
Route the wire harness under
the breather hose.
B
Install the clamp as shown.
C
Position the wire harness so
that it does not contact with
the cylinder head.
Color code
G/R .....Green/Red
CARBURETOR AND CHARGING COIL (MZ300KHIDM)
Содержание MZ250 2012
Страница 2: ...cover indd 2 2012 10 30 18 14 11 ...
Страница 6: ......
Страница 7: ...INDEX GENERAL INFORMATION GEN INFO ENGINE ENG ELECTRICAL ELEC SPECIFICATIONS SPEC 1 2 3 4 ...
Страница 12: ...1 4 GEN INFO DIMENSIONS RIGHT SIDE MZ250A MZ300A Unit in mm 5 26 133 5 18 27 464 4 13 105 3 56 90 5 ...
Страница 15: ...1 7 GEN INFO DIMENSIONS RIGHT SIDE MZ250K MZ300K Unit in mm 5 26 133 5 6 34 161 ...
Страница 40: ...4 19 SPEC ...
Страница 42: ...2012_09 1 cover indd 4 2012 10 30 18 14 11 ...