ABS (ANTI-LOCK BRAKE SYSTEM)
4-59
ET3P61057
CHECKING THE PROPORTIONING VALVE
AND METERING VALVE
1. Check:
• Proportioning valve
Cracks/damage
→
Replace the proportioning
valve.
• Metering valve
Cracks/damage
→
Replace the metering
valve
ET3P61058
INSTALLING THE HYDRAULIC UNIT
Proceed in the reverse order of removal. Pay at-
tention to the following items.
1. Install:
• Hydraulic unit
NOTE:
Do not allow any foreign materials to enter the
hydraulic unit or the brake hoses when installing
the hydraulic unit.
CAUTION:
ECA14750
Do not remove the rubber plugs or bolts
(M10
×
1.25) installed in the union bolt holes
before installing the hydraulic unit.
2. Remove:
• Rubber plugs or bolts (M10
×
1.25)
3. Install:
• Copper washer
• Brake hose (hydraulic unit to metering valve)
“1”
(to the metering valve)
• Brake hose union bolt
NOTE:
The brake hose “1” contacts the stopper “a” on
the metering valve.
4. Install:
• Copper washers
• Brake hose “1” (hydraulic unit to metering
valve)
• Brake hose “2” (hydraulic unit to proportion-
ing valve)
• Brake hose “3” (hydraulic unit to front brake
calipers)
• Brake hose “4” (rear brake master cylinder to
hydraulic unit)
• Brake hose “5” (front brake master cylinder to
hydraulic unit)
• Brake hose union bolts
NOTE:
• Make sure that the brake hoses “1”, “3”, “4”,
and “5” contact the stoppers “a” on the hydrau-
lic unit.
• Make sure that the brake hose “2” contacts the
end “b” of the brake hose “1”.
WARNING
EW3P61009
Be sure to connect each brake hose to the
correct union bolt hole.
CAUTION:
EC3P66005
To route the brake hoses, refer to “CABLE
ROUTING (FJR13A)” on page 2-47 and “CA-
BLE ROUTING (FJR13AE)” on page 2-67.
T
R
.
.
Brake hose union bolt
30 Nm (3.0 m·kg, 22 ft·lb)
1
New
T
R
.
.
Brake hose union bolt
30 Nm (3.0 m·kg, 22 ft·lb)
a
1
New
1
2
4
a
5
a
3
a
b
a
Содержание FJR13AEV(C)
Страница 1: ...SERVICE MANUAL FJR13AV C FJR13AEV C LIT 11616 19 83 3P6 28197 10 ...
Страница 6: ......
Страница 8: ......
Страница 79: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 30 ...
Страница 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 EAS20410 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Страница 84: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 1 3 2 ...
Страница 85: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 36 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Страница 86: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 6 5 4 3 2 1 ...
Страница 88: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 1 2 3 4 5 6 7 8 9 ...
Страница 90: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 4 5 3 2 1 9 8 6 7 ...
Страница 94: ...COOLING SYSTEM DIAGRAMS 2 45 A A 7 1 2 3 4 5 5 7 8 6 8 9 10 11 12 ...
Страница 100: ...CABLE ROUTING FJR13A 2 51 A B C D E 1 1 2 3 4 5 6 7 8 9 11 10 12 ...
Страница 102: ...CABLE ROUTING FJR13A 2 53 A B C D 1 2 3 4 6 5 7 8 9 10 11 12 ...
Страница 110: ...CABLE ROUTING FJR13A 2 61 D A B B C E 1 2 3 4 ...
Страница 112: ...CABLE ROUTING FJR13A 2 63 A A A B C D E P F H I J K L M N Q R 1 2 3 4 5 6 9 10 11 13 14 15 16 G 7 8 O 12 ...
Страница 120: ...CABLE ROUTING FJR13AE 2 71 B C 1 A D E G 1 2 3 4 5 6 7 8 9 14 13 10 11 12 15 F ...
Страница 122: ...CABLE ROUTING FJR13AE 2 73 A B C D E 1 2 3 4 6 5 8 7 9 11 10 12 13 ...
Страница 130: ...CABLE ROUTING FJR13AE 2 81 D B C A E E F I 3 4 5 2 1 6 H G ...
Страница 132: ...CABLE ROUTING FJR13AE 2 83 A A A B C D E P F H I J K L M N Q R 1 2 3 4 5 6 9 10 11 13 14 15 16 G 7 8 O 12 ...
Страница 136: ...CABLE ROUTING FJR13AE 2 87 ...
Страница 139: ......
Страница 198: ...GENERAL CHASSIS 4 11 b a 1 2 ...
Страница 297: ...SHAFT DRIVE 4 110 10 Fill Final gear case Refer to CHECKING THE FINAL GEAR OIL LEVEL on page 3 33 ...
Страница 298: ...SHAFT DRIVE 4 111 ...
Страница 321: ...CAMSHAFTS 5 20 ...
Страница 337: ...GENERATOR AND STARTER CLUTCH 5 36 NOTE Tighten the generator cover bolts in stages and in a crisscross pattern ...
Страница 434: ...BALANCERS 5 133 ...
Страница 450: ...WATER PUMP 6 15 ...
Страница 461: ...THROTTLE BODIES 7 10 ...
Страница 462: ...AIR INDUCTION SYSTEM 7 11 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 1 1 1 1 2 2 5 2 3 3 4 7 8 6 ...
Страница 471: ......
Страница 483: ...IGNITION SYSTEM 8 12 ...
Страница 499: ...ELECTRIC STARTING SYSTEM 8 28 ...
Страница 501: ...CHARGING SYSTEM 8 30 2 Rectifier regulator 3 AC magneto 7 Main fuse 8 Battery ...
Страница 503: ...CHARGING SYSTEM 8 32 ...
Страница 527: ...COOLING SYSTEM 8 56 ...
Страница 571: ...FUEL INJECTION SYSTEM 8 100 ...
Страница 577: ...FUEL PUMP SYSTEM 8 106 ...
Страница 583: ...WINDSHIELD DRIVE SYSTEM 8 112 ...
Страница 587: ...ACCESSORY BOX SYSTEM 8 116 50 Coupler 5 front cowling wire harness wire harness 79 Accessory box solenoid ...
Страница 589: ...ACCESSORY BOX SYSTEM 8 118 ...
Страница 599: ...ABS ANTI LOCK BRAKE SYSTEM 8 128 ...
Страница 629: ...ABS ANTI LOCK BRAKE SYSTEM 8 158 ...
Страница 673: ...YCC S Yamaha Chip Controlled Shift SYSTEM FJR13AE only 8 202 ...
Страница 674: ...ELECTRICAL COMPONENTS 8 203 EAS27970 ELECTRICAL COMPONENTS FJR13A 1 18 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ...
Страница 676: ...ELECTRICAL COMPONENTS 8 205 FJR13A 1 17 16 18 19 3 2 4 5 6 7 8 9 10 11 12 13 14 15 ...
Страница 678: ...ELECTRICAL COMPONENTS 8 207 FJR13AE 1 2 3 4 5 6 7 8 9 10 11 12 13 15 14 16 18 19 20 17 ...
Страница 680: ...ELECTRICAL COMPONENTS 8 209 FJR13AE 1 19 18 17 20 21 3 2 4 5 6 8 7 9 10 11 12 13 14 15 16 ...
Страница 717: ......
Страница 718: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...