MIDDLE GEAR
5-91
EAS25880
MEASURING THE MIDDLE GEAR
BACKLASH
1. Measure:
• Middle gear backlash
Out of specification
→
Refer to “ADJUSTING
THE MIDDLE GEAR BACKLASH” on page
5-91.
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Hold the middle drive shaft “1”.
b. Install the gear lash measurement tool “2” as
shown.
c. Make sure the dial gauge plunger contacts
the measuring point “a” on the gear lash mea-
surement tool as shown.
d. While gently turning the middle driven shaft
back and forth, measure the middle gear
backlash.
NOTE:
Measure the middle gear backlash at four posi-
tions. Rotate the middle driven shaft 90° each
time and observe the reading on the dial gauge.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
EAS25900
ADJUSTING THE MIDDLE GEAR BACKLASH
1. Loosen:
• Middle driven shaft bearing housing bolts
2. Remove:
• Middle driven pinion gear shim(s)
3. Tighten:
• Middle driven shaft bearing housing bolts
CAUTION:
ECA14050
Do not overtighten the middle driven shaft
bearing housing bolts or you may obtain too
little middle gear backlash and damage the
middle gears. If the bolts are overtightened,
loosen them until the crankcase-to-middle-
driven-shaft-bearing-housing clearance is
within specification, as stated below. Then,
repeat all of the previous steps.
NOTE:
• Tighten the middle driven shaft bearing hous-
ing bolts carefully, one thread turn at a time
only. Push in the middle driven shaft bearing
housing and then tighten the bolts to specifica-
tion.
• After tightening the middle driven shaft bearing
housing bolts, loosen them until the clearance
between the crankcase and the housing is ap-
proximately 2 mm (0.08 in), when measured
with a thickness gauge “1”.
4. Hold the middle drive shaft.
5. Turn:
• Middle driven shaft
NOTE:
While carefully tightening the middle driven shaft
bearing housing bolts in stages and in a criss-
cross pattern, turn the middle driven shaft back
and forth until the dial gauge reads 0.10–0.20
mm (0.0039–0.0079 in).
Middle gear backlash
0.10–0.20 mm (0.0039–0.0079 in)
Gear lash measurement tool
90890-01467
YM-01467
a. 14 mm (0.55 in)
T
R
.
.
Middle driven shaft bearing hous-
ing bolt
25 Nm (2.5 m·kg, 18 ft·lb)
Содержание FJR13AEV(C)
Страница 1: ...SERVICE MANUAL FJR13AV C FJR13AEV C LIT 11616 19 83 3P6 28197 10 ...
Страница 6: ......
Страница 8: ......
Страница 79: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 30 ...
Страница 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 EAS20410 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Страница 84: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 1 3 2 ...
Страница 85: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 36 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Страница 86: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 6 5 4 3 2 1 ...
Страница 88: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 1 2 3 4 5 6 7 8 9 ...
Страница 90: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 4 5 3 2 1 9 8 6 7 ...
Страница 94: ...COOLING SYSTEM DIAGRAMS 2 45 A A 7 1 2 3 4 5 5 7 8 6 8 9 10 11 12 ...
Страница 100: ...CABLE ROUTING FJR13A 2 51 A B C D E 1 1 2 3 4 5 6 7 8 9 11 10 12 ...
Страница 102: ...CABLE ROUTING FJR13A 2 53 A B C D 1 2 3 4 6 5 7 8 9 10 11 12 ...
Страница 110: ...CABLE ROUTING FJR13A 2 61 D A B B C E 1 2 3 4 ...
Страница 112: ...CABLE ROUTING FJR13A 2 63 A A A B C D E P F H I J K L M N Q R 1 2 3 4 5 6 9 10 11 13 14 15 16 G 7 8 O 12 ...
Страница 120: ...CABLE ROUTING FJR13AE 2 71 B C 1 A D E G 1 2 3 4 5 6 7 8 9 14 13 10 11 12 15 F ...
Страница 122: ...CABLE ROUTING FJR13AE 2 73 A B C D E 1 2 3 4 6 5 8 7 9 11 10 12 13 ...
Страница 130: ...CABLE ROUTING FJR13AE 2 81 D B C A E E F I 3 4 5 2 1 6 H G ...
Страница 132: ...CABLE ROUTING FJR13AE 2 83 A A A B C D E P F H I J K L M N Q R 1 2 3 4 5 6 9 10 11 13 14 15 16 G 7 8 O 12 ...
Страница 136: ...CABLE ROUTING FJR13AE 2 87 ...
Страница 139: ......
Страница 198: ...GENERAL CHASSIS 4 11 b a 1 2 ...
Страница 297: ...SHAFT DRIVE 4 110 10 Fill Final gear case Refer to CHECKING THE FINAL GEAR OIL LEVEL on page 3 33 ...
Страница 298: ...SHAFT DRIVE 4 111 ...
Страница 321: ...CAMSHAFTS 5 20 ...
Страница 337: ...GENERATOR AND STARTER CLUTCH 5 36 NOTE Tighten the generator cover bolts in stages and in a crisscross pattern ...
Страница 434: ...BALANCERS 5 133 ...
Страница 450: ...WATER PUMP 6 15 ...
Страница 461: ...THROTTLE BODIES 7 10 ...
Страница 462: ...AIR INDUCTION SYSTEM 7 11 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 1 1 1 1 2 2 5 2 3 3 4 7 8 6 ...
Страница 471: ......
Страница 483: ...IGNITION SYSTEM 8 12 ...
Страница 499: ...ELECTRIC STARTING SYSTEM 8 28 ...
Страница 501: ...CHARGING SYSTEM 8 30 2 Rectifier regulator 3 AC magneto 7 Main fuse 8 Battery ...
Страница 503: ...CHARGING SYSTEM 8 32 ...
Страница 527: ...COOLING SYSTEM 8 56 ...
Страница 571: ...FUEL INJECTION SYSTEM 8 100 ...
Страница 577: ...FUEL PUMP SYSTEM 8 106 ...
Страница 583: ...WINDSHIELD DRIVE SYSTEM 8 112 ...
Страница 587: ...ACCESSORY BOX SYSTEM 8 116 50 Coupler 5 front cowling wire harness wire harness 79 Accessory box solenoid ...
Страница 589: ...ACCESSORY BOX SYSTEM 8 118 ...
Страница 599: ...ABS ANTI LOCK BRAKE SYSTEM 8 128 ...
Страница 629: ...ABS ANTI LOCK BRAKE SYSTEM 8 158 ...
Страница 673: ...YCC S Yamaha Chip Controlled Shift SYSTEM FJR13AE only 8 202 ...
Страница 674: ...ELECTRICAL COMPONENTS 8 203 EAS27970 ELECTRICAL COMPONENTS FJR13A 1 18 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ...
Страница 676: ...ELECTRICAL COMPONENTS 8 205 FJR13A 1 17 16 18 19 3 2 4 5 6 7 8 9 10 11 12 13 14 15 ...
Страница 678: ...ELECTRICAL COMPONENTS 8 207 FJR13AE 1 2 3 4 5 6 7 8 9 10 11 12 13 15 14 16 18 19 20 17 ...
Страница 680: ...ELECTRICAL COMPONENTS 8 209 FJR13AE 1 19 18 17 20 21 3 2 4 5 6 8 7 9 10 11 12 13 14 15 16 ...
Страница 717: ......
Страница 718: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...