4 - 97
CHAS
SHAFT DRIVE
EAS00719
MEASURING THE RING GEAR BACKLASH
1. Secure the final drive assembly in a vise.
2. Remove:
• final drive oil drain bolt
3. Drain:
• final drive oil
(from the final drive assembly)
4. Measure:
• ring gear backlash
Out of specification
→
Adjust.
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Install a bolt
1
of the specified size, into the
final drive oil filler hole.
b. Finger tighten the bolt until it stops the ring
gear from moving.
NOTE:
@
Do not overtighten the bolt.
@
c. Install the final drive gear lash tool
2
and
dial gauge
3
.
a
Dial-gauge-plunger contact point 60 mm (2.36 in)
d. Gently rotate the gear coupling from
engagement to engagement.
e. Record the reading on the dial gauge.
f. Remove the dial gauge, final gear backlash
band, and bolt.
g. Rotate the final drive pinion gear 90°.
h. Reinstall the bolt, special tool, and dial
gauge.
i. Repeat steps (d) to (h) three more times (for
a total of four measurements).
j. If any of the readings are over specification,
adjust the ring gear backlash.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
Ring gear backlash
0.25 ~ 0.45 mm (0.010 ~ 0.018 in)
Final drive gear lash tool
YM-01230
Содержание FJR1300R
Страница 1: ...LIT 11616 16 18 5JW 28197 10 FJR1300R FJR1300RC SERVICE MANUAL...
Страница 6: ......
Страница 82: ...2 22 SPEC TIGHTENING TORQUES Cylinder head tightening sequence Crankcase tightening sequence...
Страница 89: ...2 29 SPEC 1 Crankshaft 2 Main axle 3 Drive axle OIL FLOW DIAGRAMS...
Страница 90: ...2 30 SPEC 1 Oil nozzle 2 Main gallery bolt 3 Crankshaft OIL FLOW DIAGRAMS...
Страница 91: ...2 31 SPEC 1 Main axle 2 Drive axle 3 Oil delivery pipe OIL FLOW DIAGRAMS...
Страница 92: ...2 32 SPEC 1 Exhaust camshaft 2 Oil check bolt 3 Intake camshaft OIL FLOW DIAGRAMS...
Страница 93: ...2 33 SPEC 1 Oil check bolt 2 Crankshaft 3 Oil cooler 4 Oil pump 5 Oil strainer 6 Oil pipe OIL FLOW DIAGRAMS...
Страница 94: ...2 34 SPEC 1 Crank pin 2 Crankshaft OIL FLOW DIAGRAMS...
Страница 95: ...2 35 SPEC 1 Rear balancer 2 Oil delivery pipe 3 Crankshaft 4 Front balancer 5 Crank pin OIL FLOW DIAGRAMS...
Страница 97: ...2 37 SPEC 1 Main axle 2 Drive axle 3 Middle drive shaft OIL FLOW DIAGRAMS...
Страница 98: ...2 38 SPEC COOLING SYSTEM DIAGRAMS 1 Radiator COOLING SYSTEM DIAGRAMS...
Страница 99: ...2 39 SPEC 1 Water jacket joint 2 Oil cooler COOLING SYSTEM DIAGRAMS...
Страница 100: ...2 40 SPEC 1 Thermostat assembly 2 Coolant reservoir 3 Radiator 4 Oil cooler COOLING SYSTEM DIAGRAMS...
Страница 101: ...2 41 SPEC 1 Coolant reservoir 2 Radiator 3 Water pump COOLING SYSTEM DIAGRAMS...
Страница 107: ...2 47 SPEC CABLE ROUTING 1 Tail brake light lead...
Страница 196: ...3 80 CHK ADJ ADJUSTING THE HEADLIGHT BEAMS...
Страница 288: ...4 92 CHAS 3 Install bearing 1 to the swingarm Installed depth a 4 0 mm 0 16 in SWINGARM...
Страница 531: ...8 35 ELEC LIGHTING SYSTEM...
Страница 570: ......
Страница 571: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A...