BRKT
Bracket unit
9
Shift rod and SPS .............................................................. 9-1
Cowling lock lever ............................................................. 9-3
Removing the cowling lock lever ............................................... 9-5
Removing the flushing hose ...................................................... 9-5
Installing the flushing hose ........................................................ 9-5
Installing the cowling lock lever ................................................. 9-6
PTT switch and bottom cowling ...................................... 9-7
Upper case and mount ................................................... 9-10
Upper case ....................................................................... 9-15
Oil pan and exhaust manifold ........................................ 9-18
Steering arm .................................................................... 9-22
Clamp bracket and swivel bracket ................................ 9-25
Removing the clamp bracket ................................................... 9-27
Checking the clamp bracket anode ......................................... 9-27
Installing the clamp bracket ..................................................... 9-27
Adjusting the trim sensor ......................................................... 9-29
PTT unit ............................................................................ 9-31
Removing the PTT unit ............................................................ 9-32
Checking the hydraulic pressure ............................................. 9-33
Bleeding the PTT unit .............................................................. 9-35
Installing the PTT unit .............................................................. 9-36
Содержание F225F
Страница 1: ...SERVICE MANUAL 6CE 28197 3N 11 F L 225F F L 250D F L 300B ...
Страница 4: ......
Страница 54: ...1 31 SPEC Specification MEMO ...
Страница 89: ...2 34 Lower unit 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 116: ...3 25 RIG GING Rigging information SET MENU CANCEL a b b c c c D q e E p v w o v C m h A B D D A B D D D F B ...
Страница 218: ...5 55 ELEC Electrical system 2 Connect the Y COP coupler a Y COP input voltage Red R Ground 12 0 V battery voltage R B a ...
Страница 254: ...6 19 FUEL Fuel system 3 Install the blowby hose f 4 Connect the air temperature sensor coupler a f a ...
Страница 263: ...6 28 Canister 0 1 2 3 4 5 6 7 8 9 10 A j k f b ...
Страница 267: ...6 32 Low pressure fuel pump 0 1 2 3 4 5 6 7 8 9 10 A 11 Fasten the vapor gas hoses p and q using the holder r q r p ...
Страница 296: ...7 13 Power unit POWR 21 Install the tube retainer H and then fasten it using the plastic tie I I H H ...
Страница 319: ...7 36 Shift actuator 0 1 2 3 4 5 6 7 8 9 10 A Shift actuator bolts d 19 N m 1 9 kgf m 14 0 ft lb c b d d a ...
Страница 477: ...8 98 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 493: ...9 14 Upper case and mount 0 1 2 3 4 5 6 7 8 9 10 A Lower mount bracket bolt o 55 N m 5 5 kgf m 40 6 ft lb t u v t v u o ...
Страница 537: ...9 58 PTT cylinder 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 562: ...A 1 MEMO ...
Страница 565: ......
Страница 566: ...May 2010 1 ABE E_1 YAMAHA MOTOR CO LTD ...
Страница 576: ...A 13 ...