5-66
0
1
2
3
4
5
6
7
8
9
10
A
2.
Disconnect the engine ECM couplers
b
and
c
.
3.
Remove the intake manifold (STBD).
4.
Remove the fuse holder
a
, and then
disconnect the fuse holder coupler
d
.
5.
Check the wiring harness for continuity.
6.
Connect the fuse holder coupler
d
, and
then install the fuse holder
a
.
7.
Connect the engine ECM couplers
b
and
c
.
8.
Connect the main wiring harness coupler
a
.
PTT electrical system
Checking the PTT relay
1.
Measure the input voltage between the
terminals
a
and
b
.
2.
Disconnect the PTT relay coupler
c
.
3.
Measure the input voltage between the
PTT relay coupler terminal and ground.
b
c
d
a
b
a
c
d
15
14
2
3
4
8
7
6
5
9
4
5
3
12
10
36
53
38
90
91
92
93
11
Wiring harness continuity:
a
Terminal 2–
b
Terminal 91
a
Terminal 3–
b
Terminal 90
a
Terminal 4–
c
Terminal 36
a
Terminal 5–
b
Terminal 38
a
Terminal 6–Ground
a
Terminal 7–
d
Terminal 4
a
Terminal 8–
c
Terminal 53
a
Terminal 9–Ground
a
Terminal 10–
d
Terminal 3
a
Terminal 11–Ground
a
Terminal 12–
d
Terminal 5
a
Terminal 14–
b
Terminal 93
a
Terminal 15–
b
Terminal 92
PTT relay input voltage:
Terminal
a
–Terminal
b
12.0 V (battery voltage)
b
a
Outboard motor and Digital Electronic Control connection / PTT electrical system
6Y9 Multifunction Color Gauge sensor /
Outboard motor and Digital Electronic Control connection / PTT electrical system
Содержание F225F
Страница 1: ...SERVICE MANUAL 6CE 28197 3N 11 F L 225F F L 250D F L 300B ...
Страница 4: ......
Страница 54: ...1 31 SPEC Specification MEMO ...
Страница 89: ...2 34 Lower unit 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 116: ...3 25 RIG GING Rigging information SET MENU CANCEL a b b c c c D q e E p v w o v C m h A B D D A B D D D F B ...
Страница 218: ...5 55 ELEC Electrical system 2 Connect the Y COP coupler a Y COP input voltage Red R Ground 12 0 V battery voltage R B a ...
Страница 254: ...6 19 FUEL Fuel system 3 Install the blowby hose f 4 Connect the air temperature sensor coupler a f a ...
Страница 263: ...6 28 Canister 0 1 2 3 4 5 6 7 8 9 10 A j k f b ...
Страница 267: ...6 32 Low pressure fuel pump 0 1 2 3 4 5 6 7 8 9 10 A 11 Fasten the vapor gas hoses p and q using the holder r q r p ...
Страница 296: ...7 13 Power unit POWR 21 Install the tube retainer H and then fasten it using the plastic tie I I H H ...
Страница 319: ...7 36 Shift actuator 0 1 2 3 4 5 6 7 8 9 10 A Shift actuator bolts d 19 N m 1 9 kgf m 14 0 ft lb c b d d a ...
Страница 477: ...8 98 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 493: ...9 14 Upper case and mount 0 1 2 3 4 5 6 7 8 9 10 A Lower mount bracket bolt o 55 N m 5 5 kgf m 40 6 ft lb t u v t v u o ...
Страница 537: ...9 58 PTT cylinder 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 562: ...A 1 MEMO ...
Страница 565: ......
Страница 566: ...May 2010 1 ABE E_1 YAMAHA MOTOR CO LTD ...
Страница 576: ...A 13 ...