8-40
Shimming (regular rotation model)
0
1
2
3
4
5
6
7
8
9
10
A
TIP:
• Measure the backlash at 4 points:
a
,
b
,
c
, and
d
, turning the drive shaft 180°
clockwise after each measurement.
• Write down the measurement data in the
shimming check sheet.
8.
Determine the backlash average, and
then round down the average to the 1/
100 place.
Example:
9.
Check that the forward gear backlash
average is within specification.
TIP:
Adjust the shim thicknesses if the forward
gear backlash is out of specification.
10. Remove the special service tools from
the propeller shaft.
11. Set the gear shift to the R position.
12. While turning the shift rod toward the R
position using the specified torque, turn
the drive shaft slowly clockwise and
counterclockwise and measure the
backlash between where the drive shaft
stops in each direction.
TIP:
• Do not turn the drive shaft using too much
force. Otherwise, the reverse gear will turn,
leading to incorrect measurements.
• When turning the drive shaft, hold it using a
little force. A knocking sound may be heard
when the drive shaft is turned, but this is
the sound of the pinion contacting the for-
ward gear and does not affect the backlash
measurement.
13. Repeat steps 7 and 8 to measure the
reverse gear backlash.
(mm)
Measurement point
a
0.25
Measurement point
b
0.26
Measurement point
c
0.26
Measurement point
d
0.24
Average
0.2525
Round-down average
0.25
Forward gear backlash:
0.04–0.59 mm (0.0016–0.0232 in)
a
b
c
d
Shift rod socket
a
: 90890-06679
Specified torque:
20 N·m (2.0 kgf·m, 14.8 ft·lb)
R
N
a
Содержание F225F
Страница 1: ...SERVICE MANUAL 6CE 28197 3N 11 F L 225F F L 250D F L 300B ...
Страница 4: ......
Страница 54: ...1 31 SPEC Specification MEMO ...
Страница 89: ...2 34 Lower unit 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 116: ...3 25 RIG GING Rigging information SET MENU CANCEL a b b c c c D q e E p v w o v C m h A B D D A B D D D F B ...
Страница 218: ...5 55 ELEC Electrical system 2 Connect the Y COP coupler a Y COP input voltage Red R Ground 12 0 V battery voltage R B a ...
Страница 254: ...6 19 FUEL Fuel system 3 Install the blowby hose f 4 Connect the air temperature sensor coupler a f a ...
Страница 263: ...6 28 Canister 0 1 2 3 4 5 6 7 8 9 10 A j k f b ...
Страница 267: ...6 32 Low pressure fuel pump 0 1 2 3 4 5 6 7 8 9 10 A 11 Fasten the vapor gas hoses p and q using the holder r q r p ...
Страница 296: ...7 13 Power unit POWR 21 Install the tube retainer H and then fasten it using the plastic tie I I H H ...
Страница 319: ...7 36 Shift actuator 0 1 2 3 4 5 6 7 8 9 10 A Shift actuator bolts d 19 N m 1 9 kgf m 14 0 ft lb c b d d a ...
Страница 477: ...8 98 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 493: ...9 14 Upper case and mount 0 1 2 3 4 5 6 7 8 9 10 A Lower mount bracket bolt o 55 N m 5 5 kgf m 40 6 ft lb t u v t v u o ...
Страница 537: ...9 58 PTT cylinder 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 562: ...A 1 MEMO ...
Страница 565: ......
Страница 566: ...May 2010 1 ABE E_1 YAMAHA MOTOR CO LTD ...
Страница 576: ...A 13 ...