10-8
10
3.
For the remaining 8 hours
c
of opera-
tion:
Operate the engine at any engine speed.
However, do not operate the engine at
full throttle for more than 5 minutes at a
time.
4.
After the 1st 10 hours of operation:
Operate the engine normally.
È
Hour
After test run
1.
Check for water in the gear oil.
2.
Check for fuel leakage in the cowling.
3.
Flush the cooling water passages using
fresh water.
NOTICE:
When flushing
the cooling water passages, do not
start the engine. Otherwise, the water
pump could be damaged and the
engine could be severely damaged
due to overheating.
TIP:
When using the flushing device (flushing
hose joint adapter), flush the cooling water
passages without starting the engine.
General periodic maintenance
Inspecting and replacing anode(s)
Do not apply, grease, oil, or paint to the
anodes or the trim tab.
1.
Check the anodes and trim tab. Clean
the anodes or trim tab if there are scales,
grease, or oil.
TIP:
• Replace the anodes or trim tab if eroded. In
addition, check the ground lead.
• If it is necessary to disassemble the out-
board motor to check an anode, refer to the
applicable disassembly procedure in this
manual.
Checking battery (for electric start
models)
1.
Check the battery. See “Checking battery
(for electric start models)” (10-4).
Checking for cooling water leakage
1.
Start the engine and check that no water
leaks from the joints between the
exhaust cover, cylinder head, cylinder
body and so on.
Checking the cooling water passage
1.
Remove the water inlet covers
1
and
trim tab
2
.
2.
Check the cooling water inlet covers
1
and water inlets. Clean if clogged.
0
1
2
10
È
a
b
c
1
1
3
4
2
a
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...