5-50
5
21. Disconnect the special service tool.
22. Install the vapor shut-off valve to the
throttle body assembly.
23. Install the throttle body assembly. See
“Installing the throttle body assembly” (6-
24).
24. Install the intake manifolds. See “Install-
ing the intake manifold” (6-18).
25. Install the intake silencer. See “Installing
Charging unit and component
Checking the lighting coil
1.
Remove the intake manifold (STBD).
See “Removing the intake manifold” (6-
17).
2.
Remove the stator assembly leads from
the plastic ties
1
, and then disconnect
the stator assembly couplers
a
.
3.
Move the stator assembly leads away
from the area covered by the intake man-
ifold, and then install the intake manifold
(STBD). See “Installing the intake mani-
fold” (6-18).
4.
Measure the lighting coil output peak
voltage between all combinations of the
terminals.
TIP:
When measuring the output peak voltage
under the cranking condition, remove the clip
from the engine shut-off switch to prevent the
engine from starting.
5.
Measure the lighting coil resistance.
6.
Remove the intake manifold (STBD).
See “Removing the intake manifold” (6-
17).
7.
Connect the stator assembly couplers,
and then fasten the stator assembly
leads using the plastic ties.
Vacuum/pressure pump gauge set
2
:
90890-06756
Specified negative pressure:
67.0 kPa (0.67 kgf/cm
2
, 9.7 psi)
2
a
1
Lighting coil output peak voltage:
Green (G)–Green (G)
r/min
Unloaded
Cranking
1500
3500
DC V
8.3
44.7
97.7
Lighting coil resistance (reference data):
Green (G)–Green (G)
0.11–0.17
Ω
at 20 °C (68 °F)
G G
G
STBD
Fuel control unit and component / Charging unit and component
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...