6-24
6
3.
Connect the special service tool
1
to the
opposite canister check valve port.
4.
Apply positive pressure and check that
no air comes out of the opposite end of
the canister check valve. Replace the
canister check valve if air comes out.
Checking the vacuum hose
1.
Check the hoses
1
,
2
, and
3
. Replace
any hose that is cracked or damaged.
Installing the throttle body assembly
1.
Install the hoses, joint, and check valve
1
, and then install the holders.
2.
Install the dowels
2
and throttle body
assembly
3
.
3.
Install the joint
4
, and then fasten it
using the plastic tie
5
.
4.
Connect the vapor gas hoses
6
and
7
.
5.
Connect the vacuum hose
8
, and then
fasten it using the holder
9
.
Vacuum/pressure pump gauge set
1
:
90890-06756
1
1
1
2
3
1
3
5
4
2
Содержание F200B
Страница 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Страница 4: ......
Страница 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Страница 23: ...1 Lower unit counter rotation model 1 19 Bracket unit 1 19 PTT unit 1 20 General tightening torque 1 21 ...
Страница 207: ...5 78 5 MEMO PTT electrical system ...
Страница 211: ...6 2 6 k Fuel rail STBD m Fuel rail PORT n Joint 7 6 f e 4 c 3 9 8 n 1 2 b d m h g k g h g 5 a Hose routing ...
Страница 314: ...7 55 POWR Power unit 17 Check that the I marks m on the VCT assembly STBD and driven sprocket STBD are aligned STBD m ...
Страница 359: ...7 100 7 MEMO Cylinder block ...
Страница 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Страница 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Страница 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Страница 473: ...8 110 8 MEMO Shimming counter rotation model ...
Страница 541: ...10 Checking the top cowling 10 15 Checking the valve clearance 10 16 Checking the water pump 10 16 ...
Страница 566: ...A 1 MEMO ...
Страница 569: ......
Страница 570: ...Jul 2011 1 CR E ...