RECOIL STARTER
5-7
E
POWR
2. Install:
•
Starter rope
•
Sheave drum
NOTE:
• Insert the rope through the rope hole
and knot the end as shown.
• Wind the rope 1-1/2 turns counterclock-
wise onto the sheave drum.
• Place the rope at the cutaway
.
WARNING
• Do not use a damaged starter rope, it
could cause injury.
3. Install:
•
Bushing
NOTE:
Mount the bushing on the starter case shaft.
4. Install:
•
Sheave drum
NOTE:
While turning the sheave drum, fit the
sheave drum shaft slot into the spiral spring
hook, and then place the sheave drum shaft
into the starter case boss.
5. Install:
•
Return spring
•
Drive pawl
NOTE:
Hook the end of the return spring onto the
drive pawl, and check to see that the drive
pawl returns smoothly.
1
1
2
1
2
3
1
1
1
2
Содержание EK25BMH
Страница 8: ......
Страница 21: ...FEATURES AND BENEFITS 1 12 E GEN INFO COOLING SYSTEM Fig 5 ...
Страница 24: ......
Страница 33: ...MAINTENANCE SPECIFICATIONS SPEC 2 8 E DIMENSIONS ...
Страница 38: ......
Страница 70: ...FUEL PUMP FUEL 4 5 E Step Job Part Q ty Remarks 14 Body 1 15 Diaphragm 1 16 Diaphragm gasket 1 ...
Страница 87: ......
Страница 129: ...CRANK SHAFT POWR 5 40 E Step Job Part Q ty Remarks 14 Crank 3 1 15 Crank 4 1 16 Bearing 1 17 Washer 1 ...
Страница 141: ......
Страница 174: ......
Страница 202: ......
Страница 218: ...CHARGING SYSTEM ELEC 8 15 E CHARGING SYSTEM WIRING DIAGRAM 1 Lighting coil G Green ...
Страница 220: ......
Страница 226: ......
Страница 227: ......
Страница 228: ...Printed on recycled paper Printed in Japan Oct 2000 0 3 1 EK25BMH YAMAHA MOTOR CO LTD ...
Страница 230: ......