SHIFT ACTUATOR
7-13
E
BRKT
4. Install:
•
Shift cam plunger
•
Compression spring
•
Bushing
NOTE:
Apply Yamaha grease A (water resistant
grease) to the shift cam plunger.
5. Install:
•
Shift lever
•
Bolt
•
Arm
6. Install:
•
Bracket
(to upper casing)
•
Bolts
•
Nut
(mount rubber front upper)
•
Rubber seal
(over the bracket)
1
2
1
4
3
2
2
T
R
.
.
Bolt
11 N
•
m (1.1 kgf
•
m, 8.1 ft
•
lb)
T
R
.
.
Bolt
11 N
•
m (1.1 kgf
•
m, 8.1 ft
•
lb)
Nut
17 N
•
m (1.7 kgf
•
m, 13 ft
•
lb)
1
2
1
2
3
2
1
2
3
4
2
3
Содержание EK25BMH
Страница 8: ......
Страница 21: ...FEATURES AND BENEFITS 1 12 E GEN INFO COOLING SYSTEM Fig 5 ...
Страница 24: ......
Страница 33: ...MAINTENANCE SPECIFICATIONS SPEC 2 8 E DIMENSIONS ...
Страница 38: ......
Страница 70: ...FUEL PUMP FUEL 4 5 E Step Job Part Q ty Remarks 14 Body 1 15 Diaphragm 1 16 Diaphragm gasket 1 ...
Страница 87: ......
Страница 129: ...CRANK SHAFT POWR 5 40 E Step Job Part Q ty Remarks 14 Crank 3 1 15 Crank 4 1 16 Bearing 1 17 Washer 1 ...
Страница 141: ......
Страница 174: ......
Страница 202: ......
Страница 218: ...CHARGING SYSTEM ELEC 8 15 E CHARGING SYSTEM WIRING DIAGRAM 1 Lighting coil G Green ...
Страница 220: ......
Страница 226: ......
Страница 227: ......
Страница 228: ...Printed on recycled paper Printed in Japan Oct 2000 0 3 1 EK25BMH YAMAHA MOTOR CO LTD ...
Страница 230: ......