RECOIL STARTER
POWR
5-8
E
6. Install:
•
Friction plate
•
Collar 1
•
Friction spring
7. Install:
•
Friction plate
(with friction spring etc.)
•
Center bolt
•
Nut
8. Install:
•
Starter rope
•
Damper
•
Starter handle-grip
•
Cover
1
2
3
T
R
.
.
Center bolt
15 N
•
m (1.5 kgf
•
m, 11 ft
•
lb)
Nut
10 N
•
m (1.0 kgf
•
m, 7.4 ft
•
lb)
1
2
3
1
2
3
1
2
3
4
Содержание EK25BMH
Страница 8: ......
Страница 21: ...FEATURES AND BENEFITS 1 12 E GEN INFO COOLING SYSTEM Fig 5 ...
Страница 24: ......
Страница 33: ...MAINTENANCE SPECIFICATIONS SPEC 2 8 E DIMENSIONS ...
Страница 38: ......
Страница 70: ...FUEL PUMP FUEL 4 5 E Step Job Part Q ty Remarks 14 Body 1 15 Diaphragm 1 16 Diaphragm gasket 1 ...
Страница 87: ......
Страница 129: ...CRANK SHAFT POWR 5 40 E Step Job Part Q ty Remarks 14 Crank 3 1 15 Crank 4 1 16 Bearing 1 17 Washer 1 ...
Страница 141: ......
Страница 174: ......
Страница 202: ......
Страница 218: ...CHARGING SYSTEM ELEC 8 15 E CHARGING SYSTEM WIRING DIAGRAM 1 Lighting coil G Green ...
Страница 220: ......
Страница 226: ......
Страница 227: ......
Страница 228: ...Printed on recycled paper Printed in Japan Oct 2000 0 3 1 EK25BMH YAMAHA MOTOR CO LTD ...
Страница 230: ......