Assembling the PTT motor
1.
Connect the PTT motor leads
1
, and
then tighten the screws
2
.
2.
Install the spring and push the brushes
3
into the brush holder, and then install the
armature
4
.
3.
Install the stator
5
onto the base.
NOTE:
Place a clean cloth over the end of the arma-
ture shaft, hold it with a pair of pliers, and
then carefully slide the stator over the arma-
ture.
BRKT
7-41
61U5H11
Bracket unit
6G470390
5
5.
Measure the brush length. Replace if
below specification limit.
6.
Check the base. Replace if cracked or
damaged.
7.
Check the bearing and oil seal. Replace
if damaged or worn.
Checking the filter
1.
Check gear pump filter
1
. Clean if there
is dirt or residue.
f
6S370150
Brush standard length:
9.8 mm (0.39 in)
Wear limit
f
:
4.8 mm (0.19 in)
6G470370
1
2
Lg
Sb
61U70210
1
61U5H11_07_1 06.2.13 1:24 PM Page 44
Содержание E115A
Страница 1: ...115B SERVICE MANUAL 61U 28197 5H 11 140B E115A E115A 115B 140B ...
Страница 4: ......
Страница 79: ...61U5H11 4 18 9 8 7 6 5 4 3 2 1 MEMO ...
Страница 136: ...POWR 5 55 61U5H11 Power unit MEMO ...
Страница 159: ...61U5H11 6 22 9 8 7 6 5 4 3 2 1 Shimming Shimming 6G46090E T3 M3 M4 M1 M2 T1 T2 F R P ...
Страница 255: ......
Страница 256: ...YAMAHA MOTOR CO LTD Printed in Japan Oct 2005 1 2 1 E_1 Printed on recycled paper E115A 115B 140B ...