INSTALLING THE INCLUDED PARTS
– 8 –
7
9
7. Installing the bell
Install the bell
1
in the position
a
shown, then
tighten it with the screw
2
.
8. Routing the wires
Confirm that hoses and wires are routed in
order starting from front to back
Front brake hose
1
Rear brake hose
2
Rear shift wire
3
Front shift wire
4
Headlight lead
5
Switch unit lead
6
Display unit lead
7
Clamp the front brake hose
1
and front shift
wire
4
with the wire clip
8
at the position
shown in the illustration.
Clamp the front shift wire
4
and headlight lead
5
with the plastic locking ties
9
at the position
shown in the illustration.
Clamp the rear brake hose
2
, rear shift wire
3
and display unit lead
7
with the plastic locking
ties
0
at the position shown in the illustration.
Clamp the front shift wire
4
and switch unit lead
6
with the wire clip
q
at the position shown in
the illustration.
a
1
2
1
Bell
1
B
2
Screw
1
B
9
8
5
4
1
0
7
3
2
q
6
9
8
5
4
1
0
7
3
2
q6
Be sure to route the wires as shown in the illus-
tration. If not, they could interfere with handle-
bar operation which could cause loss of
control.
WARNING
Содержание CROSS CONNECT Series
Страница 1: ...2018 ASSEMBLY MANUAL CROSS CONNECT PW70CNL PW70CNM PW70CNS LIT 15666 00 04 X1M 28107 13 ...
Страница 5: ...INCLUDED PARTS 3 7 9 1 3 2 q w 7 8 9 0 4 5 6 r t e ...
Страница 17: ......
Страница 18: ......