7 - 21
DRIV
REAR CONSTANT VELOCITY JOINT/FINAL DRIVE GEAR
AND DRIVE SHAFT
Order
Job name/Part name
Q’ty
Remarks
A
Thrust washer
1
B
Final drive pinion gear shim
1
C
O-ring
1
Refer to “ASSEMBLING THE FINAL
DRIVE GEAR”.
D
Oil seal
1
E
Inner race
1
F
Final drive pinion gear
1
G
Bearing retainer
1
H
Bearing
1
I
Pinion gear bearing housing
1
J
Final drive gear case
1
K
Oil seal
1
L
Bearing
1
Refer to “REMOVING AND DISASSEM-
BLING THE FINAL DRIVE ROLLER
BEARING”.
M
Bearing
1
Refer to “REMOVING AND DISASSEM-
BLING THE FINAL DRIVE ROLLER
BEARING”.
For assembly, reverse the disassembly
procedure.
Содержание 5KM2-AE1
Страница 1: ...YFM660F P 5KM2 AE1 SERVICEMANUAL 2002 ...
Страница 2: ......
Страница 8: ......
Страница 9: ...GEN INFO 1 ...
Страница 11: ...GEN INFO ...
Страница 29: ......
Страница 30: ...SPEC 2 ...
Страница 32: ...SPEC ...
Страница 43: ...2 11 SPEC MAINTENANCE SPECIFICATIONS Item Standard Cylinder head tightening sequence ...
Страница 55: ...2 23 SPEC COOLANT FLOW DIAGRAMS 1 Thermostat 2 Radiator inlet hose 3 Radiator 4 Radiator outlet hose 1 2 3 4 ...
Страница 73: ...CHK ADJ 3 ...
Страница 142: ...ENG 4 ...
Страница 146: ...ENG ...
Страница 244: ......
Страница 245: ...COOL 5 ...
Страница 247: ...COOL ...
Страница 259: ......
Страница 260: ...CARB 6 ...
Страница 262: ...CARB ...
Страница 270: ......
Страница 271: ...DRIV 7 ...
Страница 273: ...DRIV ...
Страница 306: ...CHAS 8 ...
Страница 363: ...ELEC 9 ...
Страница 365: ... ELEC 2WD 4WD SELECTING SYSTEM 9 51 CIRCUIT DIAGRAM 9 51 TROUBLESHOOTING 9 52 ...
Страница 421: ......
Страница 422: ...TRBL SHTG 10 ...
Страница 424: ...TRBL SHTG ...