–14–
CABLE ROUTING
SPEC
A Using clamp, fix to the front fork:
S
Right handlebar switch lead
S
Brake hose
Locate clamp with its head in-
ward of frame.
B Pass throttle cables through
guide.
Throttle cable installed to upper
bracket.
C With its pulling side on top. Pass
throttle cable innermost of
clamp.
D Pass main switch lead under:
S
Throttle cable (2 pcs)
S
Right handlebar switch lead
S
Speed sensor lead
And them into box at right side. In
so doing, give leads some slack.
E Pass throttle cable under box.
F Pass through holder on frame:
S
Radiator reservoir tank breath-
er hose
S
Fuel tank breather hose
G To reservoir tank
H Pass battery negative lead on
the inside of radiator reservoir
tank breather hose.
I Using clamp, fix stop switch lead
to frame. Locate clamp with its
latch outward of frame.
J Pass on the inside of side cover
insertion position.
Содержание 2002 FZS600
Страница 1: ......
Страница 56: ... 49 CIRCUIT DIAGRAM ELEC CIRCUIT DIAGRAM ...
Страница 63: ... 56 SIGNAL SYSTEM ELEC EB806000 SIGNAL SYSTEM CIRCUIT DIAGRAM ...