background image

 

4.3  Filling delivery piping with material 

1

 Open the bleeder valve by turning it 2-3 times for releasing air. 

2

 Open the air valve for the pump and increase air pressure gradually with the pump air regulator. The pump will 

start operating at approx. 0.05MPa. Adjust the pump air regulator to set pump speed to 5-8 seconds per cycle. 

3

 Air-containing material will be discharged from the bleeder valve. Put a plastic bag over the valve to receive 

discharged material. Keep the pump operating until the air inside material is released completely. Then close the 
bleeder valve by securely tightening it. 

4

 Close the air valve for the pump and set the pump air regulator to 0MPa. 

 

4.4 Operation 

1

 When filling the delivery piping with material for the first time, the air inside the piping will blow out. Please follow 

the following procedure. 

Put a plastic bag over the material outlet to receive discharged material. 

Open the valve on the delivery piping. 

Open the air valve for the pump and set the pump air regulator for minimum operating pressure. 

The pump will start discharging material from the outlet. Once the air in the piping is released completely, 
close the air valve for the pump and set the pump air regulator to 0MPa. 

The pump is now ready for operation.

 

2

 Adjust the pump air regulator to set to the desirable operating pressure. An estimate of the material discharge 

pressure to the supply air pressure is calculated by “supply air pressure × pump ratio”.   
(e.g. When operating a 38:1 ratio pump at 0.7MPa supply air pressure, material will be discharged at approx. 
26.6MPa.) 

 
 

<NOTE> 

Material viscosity varies with changes in temperature. It is recommended to make a note of appropriate pressure 
for each season. 

 

 

4.5 After work 

CAUTION 

After work or when shutting down the unit for a long period, be sure to turn off the air supply source 
to disconnect air supply to the pump, and open the valves on the material outlet or gun to release 
residual pressure inside the pump and piping. Failure to shut off air may cause damage to the hoses 
and pipes and/or leak in the valves and gun. Any secondary accidents caused by the failure 
mentioned above are the responsibility of the users. 

 

1

 Close the air valve for the pump and set the pump air regulator to 0MPa. 

2

 Open the valve on the discharge port to release residual pressure on air and material inside the pump and 

piping. 

 
 

Содержание 40 Series

Страница 1: ...SR140P50 P MODEL No 854559 50 1 SR140P25 D MODEL No 854560 25 1 SR140P38 D MODEL No 854561 38 1 SR140P50 D MODEL No 854562 50 1 SR125D13 MODEL No 854664 13 1 WARNING Prior to operating this pump be s...

Страница 2: ...ings and Cautions To use this product safely be sure to observe the contents of the following description In this manual warnings and cautions are indicated by using symbols These symbols are intended...

Страница 3: ...erty damage Be sure to use the unit in accordance with the specifications described in 7 Specifications in this manual Installation and piping Ground connection Make ground connection to pump and peri...

Страница 4: ...or breakage Do not plumb directly Do not connect the material outlet and piping directly Attach a flexible tube like a hose to connect the pump to the piping The pump if connected directly to the pipi...

Страница 5: ...Connecting suction piping 4 3 6 Discharge piping 4 3 7 Air piping 4 3 8 Preparation for use 4 3 9 Connecting the ground wire 5 4 Operating Method 4 1 Description of valve 5 4 2 Solvent cup 5 4 3 Filli...

Страница 6: ...are loose The nylon tube and the silencer are detached from the pump in the packaging due to the shipping conditions 2 Operating principle Yamada s air powered pumps employ reciprocating motion syste...

Страница 7: ...ion Use a stopper caster wheel with a brake or other locking device to prevent a mount from moving due to reciprocating pump vibration Before installing the pump verify that the shovel at the bottom i...

Страница 8: ...ng as deeply as possible After the installation please make sure that the nylon tube is firmly connected by lightly pulling it 3 3 Installation of silencer CAUTION Each connection is capped Remove the...

Страница 9: ...material outlet 2 Connect the other end of the hose to a delivery pipeline Attach a valve at the connection between the hose and the piping for maintenance and keep it closed until unit installation i...

Страница 10: ...e the pump only as necessary Avoid allowing the pump to run dry as much as possible The life expectancy of packings will be reduced The pump runs dry when a container becomes empty Stop the pump immed...

Страница 11: ...al from the outlet Once the air in the piping is released completely close the air valve for the pump and set the pump air regulator to 0MPa The pump is now ready for operation 2 Adjust the pump air r...

Страница 12: ...ng pump operation and There is no abrasion or deterioration apparently in each part of the pump Lubricate pump Lubricate pump according to the following procedure Close the air valve for the pump and...

Страница 13: ...ve is defective wear of seat surface inclusion of foreign material or packings are damaged If downward movement of plunger is faster seat surface of foot valve is defective wear of seat surface inclus...

Страница 14: ...804815 716246 Valve seat 1 per unit 10 million cycles Block 1 per unit 10 million cycles Spring 1 per unit 10 million cycles Ball 1 per unit 10 million cycles O ring 1 per unit 5 million cycles O ring...

Страница 15: ...nal injury or property damage Pump 10 years Standard Conditions of Use SR140P25 SR140P38 SR140P50 SR125D13 Application Season Temperature Material being pumped Supply air pressure Daily Amount of Mate...

Страница 16: ...1 632059 3 Slit pin 5 716288 Joint 1 6 716289 Connecting rod 1 7 716286 716290 Stud 3 8 631918 Wave spring washer 3 9 627045 Nut 3 10 804816 804817 804818 804816 804817 804818 Lower pump assembly 1 1...

Страница 17: ...1 2 716409 Bushing 1 3 700350 Cap nut 1 4 632059 Slit pin 3 5 716288 Joint 1 6 716597 Connecting rod 1 7 716290 Stud 3 8 631918 Wave spring washer 3 9 627045 Nut 3 10 804956 Lower pump assembly 1 11 7...

Страница 18: ...7 640132 O ring 1 10 38 716309 Foot valve housing 1 10 39 640015 O ring 2 10 40 685617 Pin 1 10 41 640020 O ring 1 10 42 715260 Piston body 1 10 43 685618 U packing 2 10 44 685619 Backup ring 2 10 45...

Страница 19: ...t 1 10 37 640132 O ring 1 10 38 716316 Foot valve housing 1 10 39 686305 O ring 2 10 40 632544 632543 Pin 1 10 41 640016 640015 O ring 1 10 42 715568 715576 Piston body 1 10 43 685787 685792 U packing...

Страница 20: ...valve housing 1 10 15 640135 O ring 2 10 16 701542 Stopper 1 10 17 713550 Foot valve 1 10 18 701538 Shovel rod 1 10 19 701539 Shovel 1 10 20 631916 Wave spring washer 1 10 21 627012 Nut 1 10 22 83301...

Страница 21: ...nd drum pump respectively 3 Measurement method of A weighted sound pressure level is based on ISO 1996 4 Measurement method of A weighted sound power level is based on ISO 3744 0 2 0 7 MPa Rc3 8 Equip...

Страница 22: ...NOTE Avoid continuous operation if a desired discharge volume is in the shaded area in the right side of each figure SR140P50 Performance curve SR140P25 Performance curve SR140P38 Performance curve SR...

Страница 23: ...cause corrosion inflation or dissolution of the component parts of the product 4 Irregularity arising from repair made by other than by our firm our regional office dealer or authorized service perso...

Страница 24: ...8504 Japan PHONE 81 0 3 3777 0241 FAX 81 0 3 3777 0584 E mail intl yamadacorp co jp Web www yamadacorp co jp YAMADA THAILAND CO LTD 41 79 Moo 6 Bangcha long Bangplee Sumutprakarn10540 Thailand PHONE 6...

Отзывы: