Inspection of the attachment point

-  The attachment point for the hoist must be 

selected so that the supporting structure to 
which it is to be fi tted has suffi

  cient stability 

and to ensure that the expected forces can 
be safely absorbed.

- The unit must align freely also under load 

in order to avoid impermissible additional 

loading.

-  The selection and calculation of the appropri-

ate supporting structure are the responsibil-

ity of the operating company.

Inspection of the load chain

Inspect the load chain for suffi

  cient lubrication 

and check for external defects, deformations, 

superfi cial cracks, wear and corrosion marks.

Inspection of the chain stop

The chain stop must always be fi tted to the 

loose chain end (Fig. 11). There must be no 

wear or incorrect alignment.

Inspection of the top hook and load hook

The top and load hooks must be checked 

for cracks, deformations, damage, wear and 

corrosion marks. The safety latch must move 

freely and be fully functioning.

Inspection of chain reeving in the

bottom block

All units with two or more chain falls must be 

inspected before initial operation to ensure 

that the load chain is not twisted or kinked. 

The chains of hoists with two or more falls may 

become twisted if the bottom block is rolled 

over, for example, (Fig. 10).

When replacing the chain, make sure that the 

chain is reeved correctly (Fig. 12). The chain 

weld must face outwards.

Only fi t load chains which have been approved 

by the manufacturer. Non-compliance with this 

specifi cation will render the legal warranty or 

guarantee void with immediate eff ect.

FUNCTION / OPERATION

Lifting the load

Pulling the hand chain (Fig. 11) in clockwise 

direction will raise the load.

ATTENTION:

 Depending on the type of load 

picked up, note that the lifting height may 

be reduced for models with chain container!

Lowering the load

Pulling the hand chain (Fig. 11) in anticlock-

wise direction will lower the load.

Yale overload protection device (optional)

The overload protection device is set to approx. 

25% (±15%) overload. Its adjustment must only 

be carried out by a competent person.

When the load limit is exceeded, the overload 

protection device is activated and prevents fur-

ther lifting of the load, lowering is still possible.

INSPECTION, MAINTENANCE AND 

REPAIR

According to national and international acci-

dent prevention and safety regulations hoisting 

equipment must be inspected:

• in accordance with the risk assessment of 

the operating company

• prior to initial operation

• before the unit is put into service again 

following a shut down

• after substantial changes

• however, at least once per year, by a 

competent person.

ATTENTION:

 Actual operating conditions (e.g. 

operation in galvanizing facilities) can dictate 
shorter inspection intervals.

Repair work may only be carried out by a spe-
cialist workshop that uses original Yale spare 
parts. The inspection (mainly consisting of a 
visual inspection and a function check) must 
determine that all safety devices are complete 
and fully operational and cover the condition 
of the unit, suspension, equipment and sup-
porting structure with regard to damage, wear, 
corrosion or any other alterations.

Initial operation and recurring inspections 

must be documented (e.g. in the CMCO works 

certifi cate of compliance).
If required, the results of inspections and ap-
propriate repairs must be verifi ed. If the hoist 
(from 1 t lifting weight) is fi tted on or in a trolley 
and if the hoist is used to move a lifted load 
in one or several directions, the installation 
is considered to be a crane and the further 
inspections must be carried out, as required.

Paint damage should be touched up in order to 
avoid corrosion. All joints and sliding surfaces 
should be slightly greased. In the case of heavy 
contamination, the unit must be cleaned.

The unit must be given a general overhaul 

after 10 years, at the latest.

In particular, check the dimensions of the 

load chain, the load hook and the top hook. 

They must be compared with the dimensions 

specifi ed in the table (Tab. 2, Tab. 3).

ATTENTION:

 After the replacement of 

components, a subsequent inspection by a 
competent person is obligatory!

Inspection of the load chain

(acc. to DIN 685-5)
Load chains must be inspected for mechanical 
damage at annular intervals, however after 
50 operating hours, at the latest. Inspect the 
load chain for suffi

  cient lubrication and check 

for external defects, deformations, superfi cial 
cracks, wear and corrosion marks.
Round steel section chains must be replaced 
when the original nominal thickness ´d´ on 
the chain link with the worst wear has been 
reduced by more than 10% or when the chain 
has elongated over one pitch ´p

n

´ by  5 % 

(Fig. 13) or over 11 pitches (11 x p

n

) by 3 %.

Nominal dimensions and wear limits are 
shown in table 2. If one of the limit values is 
reached, the load chain must be replaced.

Maintenance of the load chain

In most cases, chain wear in the link points 
is caused by insuffi

  cient care of the chain. In 

order to ensure optimal lubrication of the link 
contact points, lubricate the chain at regular 
intervals adapted to the application with creep-
type lubricant (e.g. gear oil).
A dry fi lm lubricant, e.g. PTFE spray, should 
be used in environments where abrasives like 
sand, etc., occur.
The service life of the load chain can be in-
creased by careful lubrication to 20 - 30 times 
compared with a chain that is not serviced.
-  When lubricating the chain, make sure the 

chain is in no-load condition so that the oil 
can reach the contact points of the chain 
links which are subject to wear. Chain link 
parts contacting each other must always be 
coated with lubricant, otherwise increased 
wear on the chain results.

-  It is not suffi

  cient to lubricate the chains on 

the outside as this does not ensure that a 
lubricant fi lm can build up in the contact 
points.

-  With a constant lifting path of the chain, the 

change-over area from lifting to lowering 
movement must be checked in particular.

-  Make sure that the load chain is lubricated 

over its entire length, also including the part 
of the chain in the housing of the hoist.

-  Clean dirty chains with petroleum or a similar 

cleaning agent, never heat the chain.

-  When lubricating the chain, also check the 

chain for wear.

ATTENTION:

 It must be ensured that no lub-

ricant can penetrate into the brake enclosure. 
This may result in failure of the brake.

Replacing the load chain

The load chain must be replaced by a new 
chain of the same dimensions and quality in 
the event of visible damage or deformations, 
however, when the discarding status has been 
reached, at the latest.

Содержание VSIII 0

Страница 1: ...slated Operating Instructions Also applicable for special versions Traduction de mode d emploi Cela s applique aussi aux autres versions DE EN FR COLUMBUS McKINNON Industrial Products GmbH P O Box 11...

Страница 2: ...nn einleiten wenn er sich davon berzeugt hat dass die Last richtig angeschlagen ist und sich keine Personen im Gefahrenbereich aufhalten Der Aufenthalt unter einer angehobenen Last ist verboten Lasten...

Страница 3: ...on gehalten werden Diese berpr fung soll sicherstellen dass auch bei Temperaturen unter 0 C die Bremsscheiben nicht vereist sind Sie ist mindestens zweimal zu wiederholen bevor mit der weiteren Arbeit...

Страница 4: ...o nicht gew hrleistet ist dass sich in den Umlenkstellen ein Schmier lm aufbaut Bei konstantem Hubweg der Kette muss auf den Umschaltbereich von Hub in Senkbewe gung besonders geachtet werden Es ist d...

Страница 5: ...gende Punkte zu beachten Das Ger t an einem sauberen und trockenen Ort lagern Das Ger t inkl aller Anbauteile vor Ver schmutzung Feuchtigkeit und Sch den durch eine geeignete Abdeckung sch tzen Haken...

Страница 6: ...ulting the manufacturer must not be used Do not use the hoist for the transportation of people Fig 6 Do not knot the load chain or connect it by using pins bolts screw drivers or similar Do not repair...

Страница 7: ...and recurring inspections must be documented e g in the CMCO works certi cate of compliance If required the results of inspections and ap propriate repairs must be veri ed If the hoist from 1t liftin...

Страница 8: ...requirements must be replaced immediately Welding on hooks e g to compensate for wear or damage is not permissible Top and or load hooks must be replaced when the mouth of the hook has opened more th...

Страница 9: ...ouve dans la zone de danger Personne ne doit se trouver ou passer sous une charge suspendue Une charge lev e ou x e ne doit pas tre laiss sans surveillance ou rester lev e ou x e pour une longue p rio...

Страница 10: ...xation Le point de xation du palan doit tre s lec tionn de telle mani re que la structure de support fournisse une stabilit su sante et que les forces pr vues puissent tre absorb s en toute s curit L...

Страница 11: ...pas qu un lm lubri ant puisse s accumuler aux points de contact Avec une voie de levage constant de la cha ne la zone de changement entre la des cente et la lev e doit tre particuli rement bien mainte...

Страница 12: ...e de la cha ne de manoeuvre Suspendre la nouvelle cha ne de manoeuvre dans le maillon ouvert et faire passer travers les guides de cha ne et la roue de la cha ne de manoeuvre Ne pas monter une cha ne...

Страница 13: ...6 Fig 3 Fig 4 Fig 5 Fig 7 Fig 8 Fig 10 Fig 9 Fig 2 Fig 1 S Bestimmungsgem e Verwendung Correct operation Utilisation correcte DE EN FR Sachwidrige Verwendung Incorrect operation Utilisations incorrec...

Страница 14: ...ndrad Description 1 Top hook with safety latch 2 Hand wheel cover 3 Load chain 4 Bottom block 5 Gear cover 6 Hand chain 7 Load hook with safety latch 8 Chain anchorage 9 Handwheel Description 1 Croche...

Страница 15: ...500kg 2 000 5 000kg Kettenverlauf Chain reeving D roulement de la cha ne DE EN FR pn 11 x pn d d Nenndicke der Kette Nominal thickness of chain Epaisseur nominale de la cha ne d1 d2 Istwert Actual val...

Страница 16: ...0 2 Rundstahlkette Round link chain Cha ne maillons mm 4 x 12 5 x 15 6 x 18 8 x 24 8 x 24 6 x 18 10 x 30 8 x 24 10 x 30 G teklasse Grade Grade T T T T T T T T T Durchmesser Diameter Diam tre dnom dmin...

Страница 17: ...17 von 20...

Страница 18: ...vollm chtigter COLUMBUS McKINNON Industrial Products GmbH Yale Allee 30 D 42329 Wuppertal Germany Datum Hersteller Unterschrift 31 01 2014 Dipl Ing Andreas Oelmann Angaben zum Unterzeichner Leiter Qua...

Страница 19: ...pas v ri e r guli rement Produit Palan manuel cha ne Type d appareil Palan manuel cha ne mod VSIII Capacit 250 5 000kg VSIII 0 25 1 VSIII 0 5 1 VSIII 1 1 VSIII 1 5 1 VSIII 2 1 VSIII 2 2 VSIII 3 1 VSII...

Страница 20: ...sales cmcosa co za Yale Engineering Products Pty Ltd 12 Laser Park Square 34 Zeiss Rd Laser Park Industrial Area Honeydew Phone 00 27 0 11 794 29 10 Web Site www yalejhb co za E mail info yalejhb co z...

Отзывы: