Central

Heating Stove

must

be

placed in the house because

it

also provides

convection

from

its

surrounding.

It

can

also be installed

in

a room or

in the kitchen having good draft. It is compulsory

to

use open

expansion

boiler.

2.2

Central

Heating Stove

can not be installed in the bedroom or outside of the house.

2.3

Chimney must be cleaned well before applying

stove

pipes.

2.4

Attention must

be

paid

so that the

pipes of the

stove

get

linked

to

each other

in good

order and

one

within the

other.

2.5

Bad

quality of the chimney draft affects the output of the stove and at the

same time, it

can

also

cause

harmful

results for the health.

2.6

Central heating

installation must be done by

the

authorized

installer by taking installation's connection

diagram into

consideration.

2.7

Draft of

the

chimney must be well

and

powerful. This particularity

can be tested

by approximating the

flame

to

the

chimney and

it

can

also be done

with

a

piece of paper.

In this

case,

piece of

paper

is

pressed to

the

opening of the chimney and is the piece of paper remains suspended,

it means that

the

draft of the chimney is good.

2.8

In

order to

prevent

the

backfire of

the

chimney, "chimney

cap"

which

turns

with the wind

must

be

applied

on the exit

of

the

chimney.

2.9

Gas

warning detector must be applied in the place where Central Heating Stove takes place.

2.10

Installation must be done

by being

in compliance with the connection diagram taking place in Figure-2.

2.11

For the circumstances when

it

is required to dismantle Central

Heating Stove, its connection must

be done

to

the

installation

with

"conic pipe couplings".

2.12 Steam exit taking

place

on the

expansion

tank must

be extended

to

restroom-bathroom

or

to

ventilation

medium.

2.13

Main line pipes of the installation must be R1" (one finger). Horizontal pipes for the final cores are
selected

as R 3/4".

2.14 Very good

heat

insulation must be done for

the

pipes passing

from

the

concrete

floor. Otherwise,

adequate heat

can not be obtained

from

the

cores.

2.15 One

or

two pipe bend(s) 2 meters of

pipe is ideal.

2.16

A strong stove tray, capable of carrying the weight and heat resistant for Central Heating Stove, must
be placed under. Distance of Central

Heating Stove from the wall must be 40

cm.

2.17

Air supply is

automatically done

with

chain driven thermostatic regulator.

2.18 Chimney of

the device

can not be

used together

with another device.

Chimney

type is

independent

and

it is not suitable for collective usage.

2.19

Ash

taking

place in the top cleaning lid (Figure

-

1/11) must be controlled

once

in

a

month. If needed,

it must be cleaned with the rake.

2.20

Mounting

of Central Heating Stove to its place is

as explained below.

2.21

In

models having chain driven

thermostatic

regulator (Figure

-

2/6), adjustment of

the heat

is done

with the numeric

values taking place

on it.

2.22 Elimination of extreme heat: if electricity cut off

occurs,

by-pass valve (Figure 4/4) must be

opened.

In models having chain driven thermostatic regulator, bottom air-inlet duct will be closed and burning
will be decreased.

MOUNTING INSTRUCTIONS:

This device

must

be

mounted by being in

compliance

with entire

domestic

(national)

legislation

and related national and

European Standards.

Type of Device

Nominal Heat

Power (kw)

Area Heating Power

(kw))

Water Heating Power

(kw)) :

Mass

of

the device (kg)

301

 

 

25

20

22

150

Highest

 

Water

 

Operating

 

Pressure

 

(bar)

 

:

 

1,2

302

 

25

20

22

 

120

1,2

401

25

  

20

175

 

1,2

303

 

25

 

20

 

22 
75

 

1,2

Содержание 301

Страница 1: ...OPERATING MANUAL Please do not use your Central Heating Stove before reading this manual with Fireplace Stoveand Solic Fuel cc MODEL NO English ...

Страница 2: ...We thank you for choosing Yakar Products You will always obtain maximum output When you read this Operating Manual prepared to assist you and as long as you comply with the instructions in it ...

Страница 3: ... THE LOCATION TO PLACE AND INSTALLATION INSTRUCTIONS 4 5 ELECTRICAL DIAGRAM 6 301 and 302 INSTALLATION CONNECTION DIAGRAM 7 OPERATING CENTRAL HEATING STOVE 8 WARNING and RECOMMENDATIONS 9 CHIMNEYS and POINTS TO TAKE INTO CONSIDERATION 10 PROBLEMS and SOLUTION PROPOSALS 11 12 POINTS TO TAKE INTO CONSIDERATION FOR THE GUARANTEE 13 ...

Страница 4: ...rrounding RE FUELLING INTERVALS Burning Condition Fuel Type Re Fuelling Interval Nominal 6 000 kcal hour coal 5 hours Slow 6 000 kcal hour coal 12 hours EXHAUST GAS TEMPERATURE Exhaust Gas temperature is 200 C average Technical Specifications Product Code Capacity Fuel Type Smoke Pipe Diameter Boiler Inlet Outlet Pipe Fuel Capacity Electricity Pump Power Net Weight Width Depth Height 301 16 25 kW ...

Страница 5: ... Rear Housing Lid 15 Riaht Housina Lid 14 Lef Housing Lid 13 Ashtray 12 Oven Glass 11 Cleaning the cover from the too 10 Lid Hamdle 9 Bottom Lid 8 Ceramic Glass 7 Middle Lid 6 Oven Lid 5 Pull And Dump Handle 4 Turninq Handle 3 Pull And Dump 2 Rotary 1 Bowl Grid Figure 1 ...

Страница 6: ... with conic pipe couplings 2 12 Steam exit taking place on the expansion tank must be extended to restroom bathroom or to ventilation medium 2 13 Main line pipes of the installation must be R1 one finger Horizontal pipes for the final cores are selected as R 3 4 2 14 Very good heat insulation must be done for the pipes passing from the concrete floor Otherwise adequate heat can not be obtained fro...

Страница 7: ...r Outlet 9 Water Flow Back To Boiler 10 Indicator Light 11 Thermometer thermostat 12 Water Level Indicator 13 herald steam dispose 14 steam outlet Make the installation of radiator heaters to structure with Conical Record so that the installation and dismantling would be easier During the installation we connect the water to boiler at 09 from the water line Expansion Boiler Figure 2 Installation c...

Страница 8: ... be turned once with the screwdriver Big yellow screw is applied to its place when shaft starts to turn 3 6 Air of the cores must be removed Water level of expansion tank must be controlled 3 7 Water is given to the system from boiler s inlet pipe Figure 2 9 from service water line 3 8 After becoming sure that there is no leakage in the system fuel is loaded to the firing chamber and then the fire...

Страница 9: ...te COKE Mix with Lignite with 1 3 rate WOOD Hu Hu Hu Hu Hu Hu Hu Hu 6650 7900 6500 7000 3200 4500 2500 3200 1100 2500 7000 7300 4500 5500 2000 3500 Kcal h Kcal h Kcal h Kcal h Kcal h Kcal h Kcal h Kcal h a Good Draft b Average Draft c Bad DraftCeki CHIMNEYS and POINTS TO TAKE INTO CONSIDERATION Pipes of Central Heating Stove must be as short and they must be in vertical direction as much as possib...

Страница 10: ...mmended one bracket FALSE RIGHT Figure 7 Expansion Connection Yanh Yanh Dogru Yanh Yanh Figure 6 Chimney Connection Expansion must be connected to boiler at least 1 degree incline s Figure 7 The roof ridge must be at least 80cm also smoke outlet should be through the window as well as If there is ash drawer it should be canceled Figure 8 Figure 8 Pipe and chimney connection ...

Страница 11: ...ll and roof insulation must be done 4 This problem disappears after burning for a certain period of time and after the walls get warm LAST CORE IS NOT GETTING WARM 1 Horizontal pipe coming to the last core has been used as small R 1 2 2 Spout has occurred towards the inside at the source of plastic pipe and cross section of the pipe has been narrowed 1 Increase the revolution of the pump If not so...

Страница 12: ...o either one of the seller dealer representative importer or manufacturer producer of the product when there is no service station If the malfunction of the product can not be eliminated within 30 Thirty days then the manufacturer producer or importer has the compulsion to allocate another product to the consumer by having similar characteristics until the repair of the products gets completed 4 I...

Страница 13: ......

Страница 14: ... the boiler water reach 70 90 C hot utility water can be obtained for a long period of time 6 HOW IS YOUR FURL COMBUSTION QUALITY In a good combustion after ignition and inflammation stage flame becomes red or orange color Glowing coal becomes eye popping brilliant In a weak combustion top surface of the coal is black during combustion and when the combustion ends some part of the coal remains unb...

Отзывы: