Manual Ozone Generating System
SMOevo
PLUS
Operation
Manual_SMOevoPLUS_eng_01.2019.doc
page 79 of 179
NOTICE!
Visually inspect the system for defects prior to starting it.
Make sure the ozone line is connected and the gas to be produced
can be included into the production process and processed according
to its intended use.
Make sure all safety elements are available and activated, and work
properly.
NOTICE!
The gas containing piping and valves must be dry after purging and may
not contain any dirt particles. If there is any uncertainty as far as the
dryness of the piping and valves are concerned, carry out the purging
process.
Refer to Chapter Purging the System for Drying Out Purposes.
8.3.1 Starting / Shutting Down the System
To start the ozone system, turn the main switch to position ON.
To shut down the ozone system, turn the main switch to position OFF.
•
The main switch of the ozone system is located at the side
panel of the control cabinet.
•
By means of the main switch the complete power supply of the
ozone generating system is turned on or off.
Содержание WEDECO SMOevo PLUS Series
Страница 1: ...Original Manual Manual WEDECO EFFIZON Ozone Generating System SMOevoPLUS Series...
Страница 36: ...Manual Ozone Generating System SMOevoPLUS Technical Data Manual_SMOevoPLUS_eng_01 2019 doc page 36 of 179...
Страница 38: ...Manual Ozone Generating System SMOevoPLUS Technical Data Manual_SMOevoPLUS_eng_01 2019 doc page 38 of 179...