Figure 2: Wet well installation

These items are required:

• Guide bars

• Guide bar bracket for attaching the guide equipment to the access

frame or to the upper part of the sump

• Level regulators or other control equipment for start, stop, and

alarm

• Cable holder for holding the cable and regulating the height of the

level regulators

• Access frame (with covers) to which the upper guide bar bracket

and cable holder can be attached

• Discharge connection for connecting the pump to the discharge

line
The discharge connection has a flange which fits the pump housing

flange and a bracket for attaching the guide equipment.

• Fasteners for the discharge connection

• Anchor bolts

1. Run a cable between the sump and the stator and monitoring

equipment.
Make sure that the cable is not sharply bent or pinched.

2. Install the access frame:

a) Place the access frame in position and align it horizontally.

b) Grout the frame in place.

3. Grout the anchor bolts in place.

Be careful when you align and position the discharge connection in

relation to the access frame.

4. Place the discharge connection in position, and tighten the nuts.
5. Install the guide bars:

a) Secure the guide bars in the bracket.

b) Check that the guide bars are placed vertically. Use a level or a

plumb line.

6. Connect the discharge pipe to the discharge connection.
7. Prepare for the level regulator:

a) Bolt the cable holder to the access frame.

b) Attach the level regulator cable to the cable holder and adjust

the height of the level regulator.

c) Protect bolts and nuts with a corrosion-preventive compound.

8. Lower the pump along the guide bars.
9. Secure the motor cable:

a) Fasten the permanent lifting device to the pump and to the ac-

cess frame. For example, you can use a stainless-steel lifting

chain with shackles.

b) Fasten the cable to the cable holder.

Make sure that the cable cannot be sucked into the pump inlet

or that it is neither sharply bent, or pinched. Support straps are

required for deep installations.

c) Connect the motor cable and the starter and monitoring equip-

ment according to the separate instructions.
Make sure that the impeller rotation is correct. For more infor-

mation, see 

Check the impeller rotation

 on page 13.

Clean all debris from the sump before starting the pump.

4.1.3  Install with Free-standing installation

In the Free-standing installation, the pump is transportable and intend-

ed to operate either completely or partially submerged in the pumped

liquid. The pump is equipped with a connection for hose or pipe and

stands on a base stand.
The stand is integrated with the pump housing and the hose is con-

nected to pump using thread coupling.
These requirements and instructions only apply when the installation is

made according to the dimensional drawing.

WS007762A

Figure 3: Free-standing installation

1. Run the cable so that it has no sharp bends. Make sure that it is not

pinched, and cannot be sucked into the pump inlet.

2. Connect the discharge line.
3. Lower the pump into the sump.
4. Place the pump on the base and make sure it cannot fall over or

sink.
Alternatively, the pump can be suspended with a lifting chain just

above the sump bottom. Make sure that the pump cannot rotate at

startup or during operation.

5. Connect the motor cable and the starter and monitoring equipment

according to the separate instructions.
Make sure that the impeller rotation is correct. For more informa-

tion, see 

Check the impeller rotation

 on page 13.

4  Installation

8

1310 Installation, Operation, and Maintenance Manual

Содержание GOULDS 2GFK2412H

Страница 1: ...Installation Operation and Maintenance Manual 90002801_3 0 1310...

Страница 2: ......

Страница 3: ...2GFK3212G 2GFK3213G 2GFK3214G 2GFK3215G 2GFK3812A 2GFK3813A 2GFK3814A 2GFK3815A 3GFK3812T 3GFK3813T 3GFK3814T 2GFV3212K 2GFV3213K 2GFV3214K 2GFV3215K 2GFV3812J 2GFV3813J 2GFV3814J 2GFV3815J Pump model...

Страница 4: ...8 4 2 Make the electrical connections 9 4 2 1 General precautions 9 4 2 2 Grounding earthing 9 4 2 3 Prepare the SUBCAB cables 9 4 2 4 Connect the motor cable to the pump 10 4 2 5 Connect the motor c...

Страница 5: ...8 Technical Reference 19 8 1 Motor data 19 Table of Contents 2 1310 Installation Operation and Maintenance Manual...

Страница 6: ...nearby equipment Qualified personnel This product must be installed operated and maintained by qualified personnel only Protective equipment and safety devices Use personal protective equipment as ne...

Страница 7: ...tention Chemicals or haz ardous fluids on skin 1 Remove contaminated clothing 2 Wash the skin with soap and water for at least 1 minute 3 Seek medical attention if necessary 1 6 Protecting the environ...

Страница 8: ...e pumped or mixed NOTICE Never use a naked flame to thaw the unit Unit in as delivered condition If the unit is still in the condition in which it left the factory all packing materials are undisturbe...

Страница 9: ...al contact The pump is equipped with thermal contacts see Monitoring Equipment on page 6 9 Support bearing Single row ball bearing 3 3 Monitoring Equipment The following applies to the monitoring equi...

Страница 10: ...ated explosion proof or intrinsically safe If the product is rated explosion proof or intrinsically safe then see the specific explosion proof information in the safety chapter before taking any fur t...

Страница 11: ...nt lifting device to the pump and to the ac cess frame For example you can use a stainless steel lifting chain with shackles b Fasten the cable to the cable holder Make sure that the cable cannot be s...

Страница 12: ...les These are the requirements to follow when you install cables The cables must be in good condition not have any sharp bends and not be pinched The cables must not be damaged and must not have inden...

Страница 13: ...e required power supply 5 Connect the mains leads L1 L2 L3 and ground earth according to applicable cable chart The ground earth lead must be 50 mm 2 0 in longer than the phase conductors in the junct...

Страница 14: ...ors and marking of main leads COLOR STANDARD STATOR LEADS BN Brown U1 U5 RD BK Black U2 U6 GN WH White V1 V5 BN OG Orange V2 V6 BU GN Green W1 W5 YE GN YE Green Yellow W2 W6 BK RD Red T1 T2 WH YE GY G...

Страница 15: ...U1 Z1 T1 T2 BK BN RD YE GC 1 BN RD 2 BK BK 3 GY WH 4 T1 OG 5 T2 BU 6 WH GN YE YE Starter 1 PHASE 12 Leads 1 U1 V1 W1 U2 V2 W2 U5 V5 W5 U6 V6 W6 U1 V1 U6 U2 W2 V6 V5 W1 W5 U5 V2 W6 U1 V1 W1 W2 U2 V2 GC...

Страница 16: ...essure level may exceed 70 dB A at certain operating points on the performance curve Make sure that you understand the noise level requirements in the environment where the product is installed Failur...

Страница 17: ...2 If it is necessary to separate the drive unit from the hydraulic unit then do the following a Carefully open the coolant plugs to relieve any built up pressure inside the cooling jacket CAUTION Com...

Страница 18: ...crews 2 Check the condition of the lifting handle and the chain 3 If necessary replace O rings 1 Replace the coolant plug O rings 2 Grease the O rings Service item Action Personnel safety de vices Che...

Страница 19: ...ad of the conical sleeve with a thin layer of grease The proper lubrication is grease for bearings for example Exxon Mobil Unirex N3 Mobil Mobilith SHC 220 or equivalent NOTICE Surplus grease can caus...

Страница 20: ...arance A between the impeller and the pump housing A 0 2 0 8 mm 0 008 0 032 in 10 Check that the impeller can rotate freely WARNING Crush Hazard Beware of the pinch point hazard between the rotating i...

Страница 21: ...distance between the start and stop levels is sufficient The non return valve s work s properly The length of the discharge pipe between the pump and the first non return valve is sufficiently short T...

Страница 22: ...otate by hand Clean the impeller Clean out the sump Check that the impeller is properly trim med The pipes are ob structed To ensure a free flow clean out the pipes The pipes and joints leak Find the...

Страница 23: ......

Страница 24: ...ced analytics solutions for water electric and gas utilities In more than 150 countries we have strong long standing relationships with customers who know us for our powerful combination of leading pr...

Отзывы: