POSSIBILITY OF ROTATION UP TO 20 °
-
The diameter of the anchoring material (clamps, bolts into dowels) must be 10 mm. A washer shall be
placed under the head of the anchoring screws/nuts to better distribute the curtain weight.
-
Screw the holder into the floor in such a way that the anchoring screws are in the end positions of the
anchoring grooves for the subsequent possibility of increasing the pre-blow of the curtain. The curtain
should be automatically rotated 10° outwards. Final fine-tuning – the curtain rotation is dealt with in point
3.7.
-
Tighten the holder to the floor.
3.3.
Vertical installation - curtain chaining
-
Chaining – connecting the curtains to one another makes it possible to create an ideal assembly for proper
clearance of the required opening according to its dimensions.
-
The correct height of the chained assembly must be at least by 100 mm longer than the actual height of the
construction opening.
-
The curtains are chained on each other using the "WIND-CONNECT" connecting piece (it is necessary to order
the pieces as accessories).
3.3.1.
Chained curtain mounting
-
Install the "WIND-CONNECT" connection piece onto the top of the anchored curtain, so that 1/2 of the
connection piece projects over the anchored curtain. Use 6 screws M6x20 (part of the connecting piece
packing) to install the connection part.
-
Lift up the curtain to be connected to the lower anchored curtain with appropriate lifting devices.
-
Ensure compliance with all safety principles resulting from handling the curtain to prevent any damage to
the property and health of persons.
-
Insert the curtain into the prepared /mounted connection piece and secure with 6 screws M6x20 (part of the
fitting package).