6.

 

Commissioning 

 

6.1.

 

Before the first start check the following:

 

-

 

If there are no objects in the curtain that could damage the unit (e.g. tools); 

 

-

 

If all the hydraulic connections are properly connected (tightness of the vent valve, connection branch and 

the mounted valve); 

 

-

 

If all electrical connections are connected correctly according according to technical documentation, 

including connection of regulation and accessories; 

 

-

 

If the curtain has all the mounting and installation screws tightened. 

 

-

 

All connections must be made in accordance with the technical documentation supplied to the unit and 

the documentation supplied to the control elements.

 

 

6.2.

 

Switching on 

 

-

 

After the first start, check the basic functionality of the individual parts of the curtain (fan operation, 

heating), and also focus on the tightness of hydraulic system. 

 

-

 

Check the other functions of the entire assembly according to the instructions for use of the selected 

regulator. 

 

 

7.

 

Regular maintenance and cleaning of the WIND curtain

 

-

 

Before any maintenance and cleaning of the curtain, the unit must be disconnected from the power supply 
and the heating water supply to the curtain exchanger must be switched off. Work must be carried out 
only  after  the  exchanger  has  cooled  down.  Otherwise,  there  is  a  risk  of  burns  and  injuries  caused  by 
rotating parts!!!

 

 

7.1.

 

Regular maintenance

 

-

 

Regular check of the curtain, especially the water exchanger, is recommended to perform every 500 hours 
of operation of the curtain. 

 

-

 

The curtain must also be checked before the start and at the end of the heating season.  

-

 

If the curtain is not used for a longer period of time, it is necessary to switch off the supply voltage to the 

curtain.  

-

 

If the temperature in the space is assumed to fall below 5°C and the temperature of the heating water is 

low, there is a risk of the heat exchanger freezing – bursting. Curtain – exchanger is not equipped with anti-

freeze protection.  

-

 

Regular maintenance must include:  

o

 

Check of heat exchanger and clean it from dust and grease, if any.  

o

 

Check of the motor and fan (bearings), remove the dust and grease on the protective cage and fan 

blades.  

o

 

Check of tightening of all screw joints on the curtain (e.g. screws for fixation of the curtain on the 

console, mounting screws into the wall), including checking mechanical damage of the curtain (e.g. 

damaged fan cage)  

 

7.2.

 

Cleaning procedure

 

-

 

Compressed air, aggressive chemicals, water or sharp objects must not be used to clean the unit 

 

-

 

Always wear protective gloves when cleaning the curtain  

-

 

The following tools are necessary to clean the curtain:  

o

 

Wrench of the appropriate size, according to the curtain  

o

 

Vacuum cleaner  

o

 

A lint-free cloth  

o

 

Brush  

o

 

Cleaning solution (soap water)  

 

Содержание WiIND Series

Страница 1: ...1 Verze 1 GBR 25 8 2020 D 502 0171 INSTALLATION AND OPERATING MANUAL FOR THE WIND AIR CURTAIN FOR INDUSTRIAL AND COMMERCIAL USE...

Страница 2: ...bearing capacity of the assembly site 8 3 1 4 Minimum assembly distances 8 3 1 5 Minimum safety distance from flammable substances 9 3 1 6 Operation environment of the curtain 9 3 1 7 Levelling of th...

Страница 3: ...tallation and electrical connection 20 3 9 1 General Information Safety 20 3 9 2 Connection of power supply and curtain control 20 3 9 3 Description of power and control terminals electrical diagram o...

Страница 4: ...serves to filter the air in the inner environment The curtain is intended mainly for entrances to industrial halls warehouses sports facilities workshops smaller facilities and commercial premises Th...

Страница 5: ...lass IP54 and IP44 according to the selected curtain type and the motor insulation class B The fan and its board are treated with powder coating RAL 9005 2 1 2 WATER EXCHANGER Maximum permissible temp...

Страница 6: ...erze 1 GBR 25 8 2020 D 502 0171 2 2 Main dimensions and requirements for the minimum working space for the WIND curtain VERTICAL INSTALLATION HORIZONTAL INSTALLATION MIN OPERATING AND INSTALLATION SPA...

Страница 7: ...chnical data EC Declaration of Conformity the current and full version of the EC Declaration of Conformity can be seen on our website www xvent cz under the Wind category hot air heating product docum...

Страница 8: ...2 Modification of existing heating distribution systems It is appropriate to use filters for rough impurities in the heating systems to protect the water exchanger from possible damage from the exist...

Страница 9: ...iling installations The curtain must stand on a flat coherent and solid surface The correct height of the curtain must be at least 100 mm longer than the actual height of the curtained hole If the hei...

Страница 10: ...r clearance of the required opening according to its dimensions The correct height of the chained assembly must be at least by 100 mm longer than the actual height of the construction opening The curt...

Страница 11: ...the curtain rear part by the fan to anchor the assembly from the side Select a suitable method and connecting material for anchoring according to the situation at the place of installation 3 3 3 Maxim...

Страница 12: ...stallation For the correct functionality of the curtain curtaining the opening the curtain must overlap on each side by at least 100 mm beyond the width of the curtained opening If the width of the op...

Страница 13: ...into the ceiling in the wall etc Wind air curtain weight table 3 5 4 Correct installation in horizontal position To allow proper rotation of the curtain 10 towards the outside area pre exhaust setting...

Страница 14: ...oring structures e g wall consoles Select suitable anchoring material and tools according to the material and the type of the background Anchoring material is not part of the delivery 3 5 7 Installati...

Страница 15: ...ding to section 3 5 1 3 6 2 Determination of the installation location for the chained curtains Determine the place for the installation of the chained curtain the exhaust curtain must be flush with t...

Страница 16: ...the connecting piece protrudes from the chained curtain Use 6 screws M6x20 part of the connecting part packing to install the connection piece Chained curtains must not be connected before lifting the...

Страница 17: ...partially unpacked curtain according to section 3 5 1 with mounted mounting hinges using a suitable handling technique e g forklift to the prepared assembly point Partial packaging pallet protective p...

Страница 18: ...ger necks This prevents the exchanger outlet from being overturned which may result in irreversible damage to the water exchanger Curtain rotation increase of pre blow at a vertical installation allow...

Страница 19: ...ction If the automatic control valve is not installed to control the heating capacity we recommend to shut off the heating water supply to the exchanger when the fan is switched off Any high temperatu...

Страница 20: ...e curtain is equipped with a wiring box containing spring terminals of the push in type for connecting the curtain power supply and control membrane bushings for pulling the control cable through and...

Страница 21: ...ction of 1 curtain 3 9 3 2 Description of the curtain connection during the chaining Connect the curtains during the chaining according to the diagram see point 5 3 The connecting terminals allow inte...

Страница 22: ...pply to the prepared electrical installation for subsequent activation of the curtain During installation the switch must be secured against being switched on again by an unauthorized person 3 9 5 Dis...

Страница 23: ...23 Verze 1 GBR 25 8 2020 D 502 0171 4 2 Control elements...

Страница 24: ...D 502 0171 5 Atacama heating unit wiring diagram 5 1 Details of connecting the main terminal box to the regulator ELEMENTAIR E M1 and with the accessories 5 2 Connection of the Wind curtain with the r...

Страница 25: ...25 Verze 1 GBR 25 8 2020 D 502 0171 5 3 Connection of chained Wind curtains with regulator ELEMENTAIR E M1...

Страница 26: ...s cooled down Otherwise there is a risk of burns and injuries caused by rotating parts 7 1 Regular maintenance Regular check of the curtain especially the water exchanger is recommended to perform eve...

Страница 27: ...r the exchanger has cooled down Any electrical service work must be carried out by a person with professional qualifications Complete the electrical connection precisely according to the supplied elec...

Страница 28: ...sed or not operable products and packaging should be returned to the appropriate recycling locations where they will dispose of them in a professional manner Please dispose the unusable parts of the p...

Страница 29: ...natural disaster When applying the warranty it is necessary to submit a report part of this document containing details of the complaining person company date and number of the sales document detail...

Отзывы: