Operation Manual
70
Preventive Maintenance
Establishing a Maintenance Program
The hour meter displays elapsed engine operating hours
and has a total readout of 9,999.9 hours. Use the hour meter
and the schedules contained in this section to establish a
comprehensive preventive maintenance program.
Figure 94. Hourmeter
Maintenance Schedule
Every Day or 8 Hours of Operation
Change engine oil and filters
Check air filter (replace if necessary)
Replace fuel filter and pre-filter
Check engine hoses and connections for leaks,
damage, and tightness
Check radiator hoses for leaks, damage, and tightness
Check electrical cables, leads, and connections for
damage and tightness
Preventive Maintenance
Check air cooler and air piping
Check air filter (replace if necessary)
Check tension and condition of drive belts (use
tension meter to check belt tension)
Lubricate front and rear drive shaft grease fittings
Lubricate front and rear axle grease fittings
Check differential oil level
Check wheel-end oil level
Check boom chain tension (adjust if necessary)
Inspect boom rollers and slide blocks for condition
and tightness
Lubricate boom roller grease fittings and chains
After Every 250 Hours of Operation or 3 Months
Replace air filters
Replace fuel filters
Check cooling system antifreeze
Check engine hoses and connections for leaks,
damage, and tightness
Check radiator hoses for leaks, damage, and tightness
After Every 500 Hours of Operation or 6 Months
Check for oil and coolant leaks
Check condition and tension of drive belts (use
tension meter to check belt tension)
Lubricate front and rear drive shaft grease fittings
Lubricate outrigger pivot point grease fittings
Lubricate front and rear axle grease fittings
Change differential oil
Change wheel-end oil
Check wheel lug nuts torqued to 380-420 ft-lbs
Lubricate boom pivot point grease fittings
Lubricate front and rear axle cylinder pivot point
grease fittings
Lubricate boom roller grease fittings and chains
Replace hydraulic return line filter
Replace transmission filter and top off fluid, as
required
Lubricate boom pivot point grease fittings
Lubricate front and rear axle cylinder pivot point grease
fittings
After First 50 Hours of Operation
All items from Pre-Operation Inspection Checklist
Crankcase Breather Tube
Fuel-Water Separator
Lubricating Oil Level
Coolant Level
Fan, Cooling
Drive Belts
Air Cleaner Restriction
Dust Ejection Valve
Air Intake Piping
Содержание XR1147
Страница 1: ...Operation and Safety Manual PN 24969 000 ...
Страница 22: ...Operation Manual 22 Labels 7 18015 001 8 18016 001 11 18018 002 12 18019 001 9 18017 001 10 18018 001 ...
Страница 23: ...Operation Manual 23 Labels 13 18020 001 14 18021 001 17 18025 001 18 18026 001 15 18022 001 16 18023 001 ...
Страница 25: ...Operation Manual 25 Labels 25 18041 001 26 18042 000 27 18043 000 28 18044 000 29 18046 000 30 18047 000 ...
Страница 27: ...Operation Manual 27 Labels 40 18471 000 41 18081 000 42 18082 001 43 18083 001 44 18086 001 45 18090 001 ...
Страница 74: ...Operation Manual 74 Lockout Tagout Do Not Operate Tags ...
Страница 75: ...Operation Manual 75 ...
Страница 76: ...8350 EASTGATE ROAD HENDERSON NV 89015 702 636 2969 800 497 1704 www XMFG com PN 24969 000 XR1147 Tier 4 Final ...