MNC-0300-021
8 of 20
Revision D
Unpacking and Installation, Rack SSPA
•
Move to the screw diagonally opposite screw #3 and
partially tighten that screw (#4).
•
If required, repeat this process for the remaining screws
(#5-#6, #7-#8).
•
When you reach the first screw tightened in this step (#1)
increase the torque on the screw and repeat the process
until the screws have all been tightened to the correct
torque.
Figure 1, Typical 4 Screw Mounting Flange Tightening Sequence
Figure 2, Typical 8 Screw Mounting Flange Tightening Sequence