Status Indicator RAPs
2-4
11/05
Workcentre PE 220
Initial Inspection
1. Check the power.
1. The machine does not work no matter how long you wait.
A. Is the Power Switch (machine and wall socket) turned on?
B. Is the Power Cord connected to the machine correctly?
C. Is the Power cord connected to the wall socket correctly?
D. Is wall socket working?
E. Is the unit rated at the same voltage as the supply?
2. Does the Fan work when power is turned on?
A. Check the connectors on the SMPS.
B. Check the fuses in the SMPS (F1).
2. Check the Installation Environment.
1. Ensure the installation surface is flat, level and free from vibration.
If necessary move the machine.
2. Ensure that the temperature and humidity of the surroundings are within specification
If necessary move the machine.
3. Ensure that the machine is positioned away from any air conditioning or other heating or cool-
ing equipment. Also ensure that is not positioned in a direct draft from any air conditioning,
fan or open window.
If necessary move the machine.
4. Ensure the machine is not positioned in direct sunlight.
If it is unavoidable use a curtain to shade the machine.
5. Ensure the machine is installed in a clean dust free environment.
Move the machine to clean area if necessary.
6. Some industrial or cleaning processes give of fumes which can affect the machine.
Move the machine away from this type of air pollution
3. Check paper type.
1. Use only paper which is of a suitable quality, weight and size.
See the user guide.
4. Check the overall condition of the machine
1. Clean the Paper Transport areas.
Any rollers with dirt surfaces should be cleaned or replaced.
Содержание WORKCENTRE PE 220
Страница 1: ...11 05 WORKCENTRE PE 220 SERVICE MANUAL 708P88337...
Страница 4: ...Introduction ii 11 05 Workcentre PE 220 Page intentionally blank...
Страница 14: ...Service Call Procedures 1 2 11 05 Workcentre PE 220 Page intentionally blank...
Страница 18: ...Status Indicator RAPs 2 2 11 05 Workcentre PE 220 Page intentionally blank...
Страница 46: ...Status Indicator RAPs 2 30 11 05 Workcentre PE 220 Page intentionally blank...
Страница 48: ...Image Quality 3 2 11 05 Workcentre PE 220 Page intentionally blank...
Страница 64: ...Image Quality 3 18 11 05 Workcentre PE 220 Page intentionally blank...
Страница 66: ...Repairs Adjustments 4 2 11 05 Workcentre PE 220 Page intentionally blank...
Страница 88: ...Repairs Adjustments 4 24 11 05 Workcentre PE 220 Page intentionally blank...
Страница 90: ...Spare Parts List 5 2 11 05 Workcentre PE 220 PL 1 Main Assembly...
Страница 92: ...Spare Parts List 5 4 11 05 Workcentre PE 220 PL 2 ADF Assembly...
Страница 94: ...Spare Parts List 5 6 11 05 Workcentre PE 220 PL 3 Platen Cover Assembly...
Страница 96: ...Spare Parts List 5 8 11 05 Workcentre PE 220 PL 4 ADF Platen Assembly...
Страница 98: ...Spare Parts List 5 10 11 05 Workcentre PE 220 PL 5 OPE Unit...
Страница 100: ...Spare Parts List 5 12 11 05 Workcentre PE 220 PL 6 Paper Path Assembly...
Страница 102: ...Spare Parts List 5 14 11 05 Workcentre PE 220 PL 7 Fuser Unit...
Страница 104: ...Spare Parts List 5 16 11 05 Workcentre PE 220 PL 8 Main Frame Assembly...
Страница 106: ...Spare Parts List 5 18 11 05 Workcentre PE 220 PL 9 MP Tray Assembly...
Страница 110: ...General Procedures Information 6 2 11 05 Workcentre PE 220 Page intentionally blank...
Страница 122: ...General Procedures and Information 6 14 11 05 Workcentre PE 220 Scanner Figure 2...
Страница 127: ...General Procedures and Information Workcentre PE 220 11 05 6 19 LSU Figure 1 Figure 2...
Страница 167: ...General Procedures and Information Workcentre PE 220 11 05 6 59 Service log...
Страница 168: ...General Procedures and Information 6 60 11 05 Workcentre PE 220 Page intentionally blank...
Страница 170: ...Wiring Diagrams 7 2 11 05 Workcentre PE 220 Page intentionally blank...
Страница 171: ...Wiring Diagrams Workcentre PE 220 11 05 7 3 WD 1 System Block Diagram...
Страница 172: ...Wiring Diagrams 7 4 11 05 Workcentre PE 220 WD 2 PJ Locations...
Страница 173: ...Wiring Diagrams Workcentre PE 220 11 05 7 5 WD 3 Connection Diagram 1 2...
Страница 174: ...Wiring Diagrams 7 6 11 05 Workcentre PE 220 WD 4 Connection Diagram 2 2...
Страница 175: ...Wiring Diagrams Workcentre PE 220 11 05 7 7 WD 5 Main Board 1 7...
Страница 176: ...Wiring Diagrams 7 8 11 05 Workcentre PE 220 WD 6 Main Board 2 7...
Страница 177: ...Wiring Diagrams Workcentre PE 220 11 05 7 9 WD 7 Main Board 3 7...
Страница 178: ...Wiring Diagrams 7 10 11 05 Workcentre PE 220 WD 8 Main Board 4 7...
Страница 179: ...Wiring Diagrams Workcentre PE 220 11 05 7 11 WD 9 Main Board 5 7...
Страница 180: ...Wiring Diagrams 7 12 11 05 Workcentre PE 220 WD 10 Main Board 6 7...
Страница 181: ...Wiring Diagrams Workcentre PE 220 11 05 7 13 WD 11 Main Board 7 7...
Страница 182: ...Wiring Diagrams 7 14 11 05 Workcentre PE 220 WD 12 LIU...
Страница 183: ...Wiring Diagrams Workcentre PE 220 11 05 7 15 WD 13 OPE...
Страница 184: ...Wiring Diagrams 7 16 11 05 Workcentre PE 220 WD 14 LSU...
Страница 185: ...Wiring Diagrams Workcentre PE 220 11 05 7 17 WD 15 ADF...
Страница 186: ...Wiring Diagrams 7 18 11 05 Workcentre PE 220 WD 16 SMPS...
Страница 187: ...Wiring Diagrams Workcentre PE 220 11 05 7 19 WD 17 HVPS 1 3...
Страница 188: ...Wiring Diagrams 7 20 11 05 Workcentre PE 220 WD 18 HVPS 2 3...
Страница 189: ...Wiring Diagrams Workcentre PE 220 11 05 7 21 WD 19 HVPS 3 3...
Страница 190: ...Wiring Diagrams 7 22 11 05 Workcentre PE 220 Page intentionally blank...