General Procedures and Information
6-54
11/05
Workcentre PE 220
GP 11 Acronyms and Abbreviations
The table below explains the abbreviations and acronyms used in this service manual. Where ab-
breviations or acronyms are used in the text please refer to this table.
Table 1: Acronyms and Abbreviations
Abbreviations
Explanation
AP Access
Point
AC Alternating
Current
APC
Auto Power Control
ASIC
Application Specific Integrated Circuit
BIOS
Basic Input Output System
BLDC
Brush-less Direct Current
CN connector
CON connector
CPU
Central Processing Unit
dB decibel
dbA decibel
A
dBM decibel
milliwatt
DC direct
current
DCU
Diagnostic Control Unit
DPI
Dot Per Inch
DRAM
Dynamic Random Access Memory
DVM Digital
Voltmeter
ECP
Enhanced Capability Port
EDC
Embedded Diagnostic control
EEPROM
Electronically Erasable Programmable Read Only Memory
EMI Electro
Magnetic
Interference
EP electrophotographic
EPP
Enhanced Parallel Port
FPOT
First Printout Time
F/W firmware
GDI
graphics device interface
GND ground
HBP Host
Based
Printing
HDD
Hard Disk Drive
H/H
High temperature and high humidity
HV high
voltage
HVPS
High Voltage Power Supply
I/F interface
I/O Input
and
Output
IC integrated
circuit
IDE
Intelligent Drive electronics or Embedded Drive Electronics
IEEE
Institute of Electrical and Electronics Engineers. Inc.
IPA Isopropy
Alcohol
IPM Images
Per
Minute
Содержание WORKCENTRE PE 220
Страница 1: ...11 05 WORKCENTRE PE 220 SERVICE MANUAL 708P88337...
Страница 4: ...Introduction ii 11 05 Workcentre PE 220 Page intentionally blank...
Страница 14: ...Service Call Procedures 1 2 11 05 Workcentre PE 220 Page intentionally blank...
Страница 18: ...Status Indicator RAPs 2 2 11 05 Workcentre PE 220 Page intentionally blank...
Страница 46: ...Status Indicator RAPs 2 30 11 05 Workcentre PE 220 Page intentionally blank...
Страница 48: ...Image Quality 3 2 11 05 Workcentre PE 220 Page intentionally blank...
Страница 64: ...Image Quality 3 18 11 05 Workcentre PE 220 Page intentionally blank...
Страница 66: ...Repairs Adjustments 4 2 11 05 Workcentre PE 220 Page intentionally blank...
Страница 88: ...Repairs Adjustments 4 24 11 05 Workcentre PE 220 Page intentionally blank...
Страница 90: ...Spare Parts List 5 2 11 05 Workcentre PE 220 PL 1 Main Assembly...
Страница 92: ...Spare Parts List 5 4 11 05 Workcentre PE 220 PL 2 ADF Assembly...
Страница 94: ...Spare Parts List 5 6 11 05 Workcentre PE 220 PL 3 Platen Cover Assembly...
Страница 96: ...Spare Parts List 5 8 11 05 Workcentre PE 220 PL 4 ADF Platen Assembly...
Страница 98: ...Spare Parts List 5 10 11 05 Workcentre PE 220 PL 5 OPE Unit...
Страница 100: ...Spare Parts List 5 12 11 05 Workcentre PE 220 PL 6 Paper Path Assembly...
Страница 102: ...Spare Parts List 5 14 11 05 Workcentre PE 220 PL 7 Fuser Unit...
Страница 104: ...Spare Parts List 5 16 11 05 Workcentre PE 220 PL 8 Main Frame Assembly...
Страница 106: ...Spare Parts List 5 18 11 05 Workcentre PE 220 PL 9 MP Tray Assembly...
Страница 110: ...General Procedures Information 6 2 11 05 Workcentre PE 220 Page intentionally blank...
Страница 122: ...General Procedures and Information 6 14 11 05 Workcentre PE 220 Scanner Figure 2...
Страница 127: ...General Procedures and Information Workcentre PE 220 11 05 6 19 LSU Figure 1 Figure 2...
Страница 167: ...General Procedures and Information Workcentre PE 220 11 05 6 59 Service log...
Страница 168: ...General Procedures and Information 6 60 11 05 Workcentre PE 220 Page intentionally blank...
Страница 170: ...Wiring Diagrams 7 2 11 05 Workcentre PE 220 Page intentionally blank...
Страница 171: ...Wiring Diagrams Workcentre PE 220 11 05 7 3 WD 1 System Block Diagram...
Страница 172: ...Wiring Diagrams 7 4 11 05 Workcentre PE 220 WD 2 PJ Locations...
Страница 173: ...Wiring Diagrams Workcentre PE 220 11 05 7 5 WD 3 Connection Diagram 1 2...
Страница 174: ...Wiring Diagrams 7 6 11 05 Workcentre PE 220 WD 4 Connection Diagram 2 2...
Страница 175: ...Wiring Diagrams Workcentre PE 220 11 05 7 7 WD 5 Main Board 1 7...
Страница 176: ...Wiring Diagrams 7 8 11 05 Workcentre PE 220 WD 6 Main Board 2 7...
Страница 177: ...Wiring Diagrams Workcentre PE 220 11 05 7 9 WD 7 Main Board 3 7...
Страница 178: ...Wiring Diagrams 7 10 11 05 Workcentre PE 220 WD 8 Main Board 4 7...
Страница 179: ...Wiring Diagrams Workcentre PE 220 11 05 7 11 WD 9 Main Board 5 7...
Страница 180: ...Wiring Diagrams 7 12 11 05 Workcentre PE 220 WD 10 Main Board 6 7...
Страница 181: ...Wiring Diagrams Workcentre PE 220 11 05 7 13 WD 11 Main Board 7 7...
Страница 182: ...Wiring Diagrams 7 14 11 05 Workcentre PE 220 WD 12 LIU...
Страница 183: ...Wiring Diagrams Workcentre PE 220 11 05 7 15 WD 13 OPE...
Страница 184: ...Wiring Diagrams 7 16 11 05 Workcentre PE 220 WD 14 LSU...
Страница 185: ...Wiring Diagrams Workcentre PE 220 11 05 7 17 WD 15 ADF...
Страница 186: ...Wiring Diagrams 7 18 11 05 Workcentre PE 220 WD 16 SMPS...
Страница 187: ...Wiring Diagrams Workcentre PE 220 11 05 7 19 WD 17 HVPS 1 3...
Страница 188: ...Wiring Diagrams 7 20 11 05 Workcentre PE 220 WD 18 HVPS 2 3...
Страница 189: ...Wiring Diagrams Workcentre PE 220 11 05 7 21 WD 19 HVPS 3 3...
Страница 190: ...Wiring Diagrams 7 22 11 05 Workcentre PE 220 Page intentionally blank...