15
INSTALLATION GUIDE FEELGOOD SHOWER UV/IR V4
10. MOUNTING ALUMINIUM FRAME
11. MOUNTING AIR SLEEVES
12. PREPARATIONS FOR INSTALLATION DONE
13. MOUNTING THE UNIT
Pay attention!
Allow the sealant to harden well, see the
manual of the kit used.
We recommend a drying time of 24 hours. Before continuing
remove the safety bracket.
Place the unit straight in the
frame. Screw it into the frame
with the 6 screws supplied.
6x